BLD00-01827
| BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:15. Contact: . shafts need back 1 hr at walls/ efis needs drip edge at brick wyanes transition/ support ceilling framing at restaroom kitchen wall/ fire blk walls at cielling line. 10/17/2000 9:50:01 AM
|
BLD00-00286
| BLD-Foundation | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | A | PART |
|
|
grade beam Bruce ###-#### placed w/spec 10/17/2000 9:56:43 AMial insp. pending report. 10/17/2000 9:57:02 AM
|
BLD00-00450
| BLD-Final | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 07:52:50. Contact: ###-####. l/c for work card with contractor. 10/18/2000 5:00:03 PM
|
BLD00-00662
| BLD-Footing | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PASS |
|
|
ft insp robert ###-#### pending soil report. 10/17/2000 3:22:55 PM
|
BLD00-01261
| BLD-Footing | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PASS |
|
|
REBAR INSP -###-#### OFFICE RICH footting ok 10/17/2000 3:21:02 PM
|
BLD00-02441
| BLD-Conference | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PART |
|
|
Ory ###-####
|
BLD00-01726
| BLD-Concrete | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 09:11:13. Contact: ###-####.
|
BLD00-01563
| BLD-Concrete | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:17:17. Contact: ###-####.
|
BLD00-02229
| BLD-Final | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | FAIL |
|
|
JESSIE ###-#### FN OCC need occ card need exit door hardware/ door in hall. 10/17/2000 4:53:50 PM
|
BLD00-01783
| BLD-Footing | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PART |
|
|
###-#### south wall alin to 10 grid pipes to be protected pend s/i report. 10/17/2000 2:34:02 PM
|