ELE00-03999
| Electrical Rough-In | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | A | NR |
|
|
###-#### conf. with contractor 10/17/2000 12:00:36 PM
|
ELE00-04001
| Temporary Service | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | A | PASS |
|
|
Gary ###-#### t/s u/g n ok 10/17/2000 12:01:15 PM
|
ELE00-03980
| Permanent Service | 10/16/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 18:36:24. Contact: ###-####. corrections nec 110-3 (b)--300-4(d)--250-148 10/17/2000 11:59:55 AM
|
ELE00-04011
| Rough-In Permanent Service | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PASS |
|
|
jason ###-#### r/i & ser p/s u/g n ok-okcover ri 10/18/2000 6:50:02 AM
|
ELE00-04012
| Permanent Service | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PART |
|
|
Marv ###-#### converting from oh to ug inspection must be done late pm so Idaho Power can hit with power this afternoon p/s u/g reconnect t/w debbie at ipco. contractor not totally ready they to call for final when done. 10/18/2000 6:52:53 AM
|
ELE00-03941
| Electrical Rough-In | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | FAIL |
|
|
2ND FLOOR FRANK -- ###-#### R/I everything is ok to cover except they need to protect ser cables on west ext. wall 10/18/2000 6:56:03 AM
|
ELE00-03999
| Electrical Rough-In | 10/17/2000 | 10/17/2000 | 10/17/2000 12:00:00 AM | P | PASS |
|
|
DAVE - ###-#### R/I ok cover walls and cieling 10/18/2000 6:53:56 AM
|