PLM01-02382
| PLM-Aging Inspection | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | | NR |
|
|
|
PLM01-03516
| Water and/or Sewer | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 10/17/2001 8:26:39 AM this was a g/w. 10/17/2001 8:41:27 AM
|
PLM01-03552
| Water and/or Sewer | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PASS |
|
|
###-#### HAROLD
|
PLM01-03477
| Water and/or Sewer | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-03517
| Final | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 13:42:21. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/17/2001 at 06:41:58.
|
PLM01-02823
| Water and/or Sewer | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 16:15:00. Contact: ###-####. pump station west to with in 15' of building tie in 10/17/2001 2:57:48 PM
|
PLM01-03369
| Water and/or Sewer | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 17:37:19. Contact: ###-####. called in the wrong permit number 10/17/2001 8:26:12 AM
|
PLM01-03516
| Groundwork | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 10/17/2001 8:41:07 AM
|
PLM01-03527
| Plumbing Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | NR |
|
|
###-####
|
PLM01-03559
| Water and/or Sewer | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | NR |
|
|
###-####
|
PLM01-02849
| Water and/or Sewer | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 10/17/2001 2:43:23 PM 2nd 45 down stream of the meeter plus 20', no thrust blocks yet
|
PLM01-02823
| Water and/or Sewer | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 10/17/2001 3:00:48 PM oops, will need to submit as builts for gravity main field adjustments, main conduit bank is at the same location as the sewer, looks like the upper manhole will move back to the building drain connection location.
|
PLM01-02823
| Water and/or Sewer | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 10/17/2001 3:01:13 PM manhole set building drain run and stub to interceptor 10' out of mh 10/17/2001 4:43:43 PM
|
PLM01-03559
| Water and/or Sewer | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 330 On 10/17/2001 3:02:23 PM
|
PLM01-03527
| Plumbing Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 10/17/2001 3:03:09 PM
|
PLM01-00431
| Groundwork | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 08:32:54. Contact: ###-####.
|