Inspections for the day of: Wednesday, October 17, 2001.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-02382 PLM-Aging Inspection10/17/200110/17/200110/17/2001 12:00:00 AM NR
PLM01-03516 Water and/or Sewer10/17/200110/17/200110/17/2001 12:00:00 AMAPART
Scheduled by Inspector: 330 On 10/17/2001 8:26:39 AM this was a g/w. 10/17/2001 8:41:27 AM
PLM01-03552 Water and/or Sewer10/16/200110/17/200110/17/2001 12:00:00 AMAPASS
###-#### HAROLD
PLM01-03477 Water and/or Sewer10/16/200110/17/200110/17/2001 12:00:00 AMAPASS
###-####
PLM01-03517 Final10/16/200110/17/200110/17/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 10/16/2001 at 13:42:21. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/17/2001 at 06:41:58.
PLM01-02823 Water and/or Sewer10/16/200110/17/200110/17/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2001 at 16:15:00. Contact: ###-####. pump station west to with in 15' of building tie in 10/17/2001 2:57:48 PM
PLM01-03369 Water and/or Sewer10/16/200110/17/200110/17/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 10/16/2001 at 17:37:19. Contact: ###-####. called in the wrong permit number 10/17/2001 8:26:12 AM
PLM01-03516 Groundwork10/17/200110/17/200110/17/2001 12:00:00 AMAPASS
Added by Inspector: 330 On 10/17/2001 8:41:07 AM
PLM01-03527 Plumbing Rough-in10/17/200110/17/200110/17/2001 12:00:00 AMPNR
###-####
PLM01-03559 Water and/or Sewer10/17/200110/17/200110/17/2001 12:00:00 AMPNR
###-####
PLM01-02849 Water and/or Sewer10/17/200110/17/200110/17/2001 12:00:00 AMPPART
Added by Inspector: 330 On 10/17/2001 2:43:23 PM 2nd 45 down stream of the meeter plus 20', no thrust blocks yet
PLM01-02823 Water and/or Sewer10/17/200110/17/200110/17/2001 12:00:00 AMPPART
Added by Inspector: 330 On 10/17/2001 3:00:48 PM oops, will need to submit as builts for gravity main field adjustments, main conduit bank is at the same location as the sewer, looks like the upper manhole will move back to the building drain connection location.
PLM01-02823 Water and/or Sewer10/17/200110/17/200110/17/2001 12:00:00 AMPPART
Scheduled by Inspector: 330 On 10/17/2001 3:01:13 PM manhole set building drain run and stub to interceptor 10' out of mh 10/17/2001 4:43:43 PM
PLM01-03559 Water and/or Sewer10/17/200110/17/200110/17/2001 12:00:00 AMPNR
Scheduled by Inspector: 330 On 10/17/2001 3:02:23 PM
PLM01-03527 Plumbing Rough-in10/17/200110/17/200110/17/2001 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 10/17/2001 3:03:09 PM
PLM01-00431 Groundwork10/17/200110/17/200110/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/17/2001 at 08:32:54. Contact: ###-####.