BLD01-01141
| BLD-Aging Inspection | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | | DONE |
|
|
work in progress 10/17/2001 9:39:27 AM
|
BLD01-02410
| BLD-Framing/Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | FAIL |
|
|
###-#### brace wall panels c/n on site 10/17/2001 10:14:57 AM
|
MIS01-00124
| BLD-Final | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00617
| BLD-Framing/Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | FAIL |
|
|
###-#### after 9am shear nailing on southwall need rfi from engineer 10/17/2001 12:26:42 PM
|
BLD01-01585
| BLD-Conference | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | DONE |
|
|
###-####
|
BLD01-01054
| BLD-Concrete | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 18:06:46. Contact: ###-####. rebar and concrete inspected using specal inspection 10/17/2001 10:32:17 AM
|
BLD01-02454
| BLD-Other | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | CANC |
|
|
need to post a stop work on this job....OKed with Bob-returned check and they were to come in last week to take care of and haven't. Thanks Linda
|
BLD01-02617
| BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PASS |
|
|
###-#### CHUCK
|
BLD01-02485
| BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PASS |
|
|
###-#### JOHN c/n items completed 10/17/2001 3:38:32 PM
|
BLD01-02485
| BLD-Energy code compliance | 10/16/2001 | 10/17/2001 | 10/17/2001 12:00:00 AM | P | PART |
|
|
###-####
|