Inspections for the day of: Friday, October 17, 2003.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00199 INSP-Final Inspection10/14/200310/17/200310/17/2003 8:34:53 AMACANC
Scheduled by a contractor via Hello! on 10/14/2003 at 1:48:31 PM. Contact: ###-####. Inspection cancelled from web by: Terry Owsley
FIR03-00373 FIR-Aging Inspection10/17/200310/17/200310/17/2003 12:00:00 AM PASS
wip 10/17/2003 7:15:41 AM
BLD03-01903 FIRE-Final Inspection10/16/200310/17/200310/17/2003 12:00:00 AMAPASS
FIR03-00136 INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2003 at 4:02:04 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor; resubmit for changes to concealed space under elevator machine room and plastic pipe use instead of steel 10/17/2003 10:19:10 AM
FIR03-00135 INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2003 at 4:02:56 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor 10/17/2003 10:19:56 AM
FIR03-00115 INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2003 at 4:03:46 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor 10/17/2003 10:20:32 AM
FIR03-00138 INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2003 at 4:08:04 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor; resubmit for concealed space under elevator machine room and plastic pipe instead of steel 10/17/2003 10:21:50 AM
FIR03-00137 INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2003 at 4:09:05 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor 10/17/2003 10:22:17 AM
FIR03-00139 INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/16/2003 at 4:10:07 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping at corridor needed 10/17/2003 10:17:40 AM
FIR03-00461 INSP-Final Inspection10/17/200310/17/200310/17/2003 12:00:00 AMAPASS
BLD03-01055 FIRE-Final Inspection10/17/200310/17/200310/17/2003 12:00:00 AMPFAIL
ROD; Phone #: ###-#### Internet Inspection Request from: Annette Moore extinguisher mounted; "Door to remain....." sign at main door 10/17/2003 4:05:53 PM
FIR03-00537 INSP-Final Inspection10/17/200310/17/200310/17/2003 12:00:00 AMPPASS
FIR03-00580 INSP-Final Inspection10/17/200310/17/200310/17/2003 12:00:00 AMPPASS
FIR03-00426 INSP-Final Inspection10/17/200310/17/200310/17/2003 12:00:00 AMPPART
need sign on outside bell; need calc sticker and blue inspection tag; need spare heads and box hung; remove tape and add escutcheons on several heads 10/17/2003 4:03:42 PM
BLD03-01913 FIRE-Final Inspection10/17/200310/17/200310/17/2003 12:00:00 AMPPASS
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD02-02853 FIRE-Conference10/16/200310/17/200310/17/2003 12:00:00 AMPPART
colyn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore phased project and okay to occupy the north side of the first floor; stairways to remain clear of debris, etc 10/17/2003 4:02:21 PM