FIR05-00522
| INSP-Final Inspection | 10/17/2005 | 10/17/2005 | 10/17/2005 4:28:31 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR05-00475
| INSP-Sprinkler Rough-in/Hydro | 10/17/2005 | 10/17/2005 | 10/17/2005 4:10:37 PM | P | FAIL |
|
|
Heads in two locations are overspaced off walls, remove uprights that are not required above the drop ceiling.
|
BLD05-01632
| FIRE-Final Inspection | 10/17/2005 | 10/17/2005 | 10/17/2005 1:59:24 PM | P | PASS |
|
|
Fire life safety passed inspection.
|
FIR05-00683
| INSP-Final Inspection | 10/14/2005 | 10/17/2005 | 10/17/2005 1:58:25 PM | A | PASS |
|
|
Fire sprinkler passed inspection.
|
FIR05-00447
| INSP-Sprinkler Rough-in/Hydro | 10/17/2005 | 10/17/2005 | 10/17/2005 1:19:14 PM | P | PART |
|
|
Inspected outside soffit, concealed areas below stairs, hard lid areas 2nd floor, attic dry system 1st floor east and 2nd floor, provide coverage for concealed combustible mechanical shafts, provide restraint for sprig-ups over 4' in length.
|
FIR05-00499
| INSP-Sprinkler Rough-in | 10/14/2005 | 10/17/2005 | 10/17/2005 12:29:44 PM | A | FAIL |
|
|
The riser and stub out appear to be installed in a satisfactory manner, however no city stamped approved plans were available on site to confirm or verify the install.
|
BLD04-01323
| FIRE-Conference | 10/13/2005 | 10/17/2005 | 10/17/2005 11:09:11 AM | A | DONE |
|
|
On site discussion regarding inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
|
BLD04-01324
| FIRE-Conference | 10/13/2005 | 10/17/2005 | 10/17/2005 11:06:48 AM | A | DONE |
|
|
On site meeting to discuss inspection scheduling, project phasing, shell and tenant inspections, requirements for occupancy.
|
BLD05-02542
| FIRE-Final Inspection | 10/14/2005 | 10/17/2005 | 10/17/2005 11:02:16 AM | A | PASS |
|
|
Items on correction notice have been completed, life safety passed inspection.
|
FIR05-00654
| INSP-Final Inspection | 10/17/2005 | 10/17/2005 | 10/17/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinkler permit finaled.
|