PLM05-04309
| Med/Gas Systems | 10/17/2007 | 10/17/2007 | 10/17/2007 4:19:22 PM | P | CANC |
|
|
|
PLM05-04309
| Med/Gas Systems | 10/16/2007 | 10/17/2007 | 10/17/2007 4:17:16 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2007 at 4:07:56 PM. Contact: ###-####. start of 24 hr pressure test on second floor in central tower to medical equipment room
|
PLM07-02434
| Groundwork | 10/16/2007 | 10/17/2007 | 10/17/2007 3:06:42 PM | P | PART |
|
|
This is for area B. Please call Omar with ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel ground work for area B test ok ok to cover
|
PLM07-03496
| Water and/or Sewer | 10/17/2007 | 10/17/2007 | 10/17/2007 2:24:41 PM | P | PASS |
|
|
TIm; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt sewer test ok
|
PLM07-02663
| Final | 10/17/2007 | 10/17/2007 | 10/17/2007 2:03:22 PM | P | PASS |
|
|
cj Phone #: ###-####
|
PLM07-03501
| Final | 10/16/2007 | 10/17/2007 | 10/17/2007 9:56:36 AM | A | PASS |
|
|
|
PLM07-02704
| Groundwork | 10/16/2007 | 10/17/2007 | 10/17/2007 9:23:35 AM | A | PART |
|
|
Gas and sand trap ...........Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige need first chamber vent in interceptor need sampling port on down stream side of interceptor need to pull water tight lid to confirm tank is full of water for test on tank called contractor will recall when ready
|