Inspections for the day of: Wednesday, October 17, 2007.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00536 INSP-Final Inspection10/17/200710/17/200710/18/2007 2:29:02 PMPCANC
overbooked
FIR07-00235 INSP-Sprinkler Rough-in/Hydro10/16/200710/17/200710/18/2007 11:09:14 AMAPASS
Above ground hydro on Bldg 3 passed
FIR07-00346 INSP-Supply line flush10/16/200710/17/200710/18/2007 8:20:52 AMPPASS
UG Flush passed
BLD07-00948 FIRE-Conference10/17/200710/17/200710/17/2007 3:21:45 PMPDONE
I deferred a fire watch request to dave hanniman and answered general questions about a racking permit.
FIR07-00163 INSP-Sprinkler Rough-in/Hydro10/15/200710/17/200710/17/2007 3:04:24 PMPPASS
The hydro test for the header and fdc and the preaction system passed.
BLD07-00277 FIRE-Final Inspection10/17/200710/17/200710/17/2007 2:31:47 PMPPASS
LIfe safety passed.
FIR06-00011 INSP-Alarm Testing10/17/200710/17/200710/17/2007 1:58:13 PMADONE
See mike timmermans notes for items tested.
FIR06-00584 INSP-Sprinkler Rough-in10/16/200710/17/200710/17/2007 1:24:19 PMAPART
This roughin was already done on Tuesday 10-16 under the wrong WPS. The ceiling tile is ok to install. Two rows of pendant sprinklers are blocked by duct work mounted at the ceiling level. The pendants have been installed outside of their listing. No other items except these heads were looked at. I spoke with the building representatives of WPS and we discussed height controls for the racks and moving the existing emergency lights which are at the deck to be below the new ceiling. I advised Forrest of the status.
BLD07-00693 FIRE-Final Inspection10/16/200710/17/200710/17/2007 12:44:06 PMAPASS
life safety passed.
FIR07-00673 INSP-Final Inspection10/16/200710/17/200710/17/2007 12:24:37 PMAPASS
FIre alarm finaled. The temperature sensors operated correctly.
FIR07-00718 INSP-Final Inspection10/16/200710/17/200710/17/2007 12:23:42 PMAPASS
Permit finaled. The sprig ups into the overbuild areas are complete and match plans including the wire seismic supports. The insulation is at the roof deck. Forward flush of the backflow preventor passed.
FIR07-00316 INSP-Final Inspection10/16/200710/17/200710/17/2007 12:22:56 PMAPASS
Permit finaled
FIR07-00619 INSP-Final Inspection10/16/200710/17/200710/17/2007 12:22:09 PMAPASS
Permit finaled. The sprig ups into the overbuild areas are complete and match plans including the wire seismic supports. The insulation is at the roof deck. Forward flush of the backflow preventor passed.
FIR06-00988 INSP-Sprinkler Rough-in/Hydro10/16/200710/17/200710/17/2007 10:50:34 AMAPASS
Above ground hydro test passed.
BLD05-00635 FIRE-Final Inspection10/16/200710/17/200710/17/2007 10:04:55 AMAFAIL
The exit signs and emergency lights located on the roof and at the ground level exits are in question due to motion detectors and photo sensors being installed to control them. Per the electrical engineer NFPA 101 allows the use of motion detectors. I deferred him to Sam Rogers for the final decision for acceptance. The fire alarm system needs to be satifactory for Mike Timmerman prior to phase 1 sign off as well.
FIR06-00007 INSP-Final Inspection10/16/200710/17/200710/17/2007 9:05:53 AMACANC
Cancell per Jeff Walton
FIR06-00744 INSP-Final Inspection10/16/200710/17/200710/17/2007 9:02:05 AMAPASS
permit finaled
BLD07-02089 FIRE-Final Inspection10/16/200710/17/200710/17/2007 8:40:16 AMAPASS
Life safety passed. The owner is going to remove the duct smoke detectors since they are not required by code and can not be placed correctly.
FIR06-00618 INSP-Final Inspection10/16/200710/17/200710/17/2007 8:20:06 AMAPASS
permit finaled