Inspections for the day of: Friday, October 17, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00997 FIRE-Final Inspection10/17/200810/17/200810/20/2008 11:18:41 AMPPASS
Life safety passed
FIR08-00627 INSP-Sprinkler Rough-in10/17/200810/17/200810/17/2008 4:06:26 PMPPASS
Per Mark Senteno the PIV is ok to be located approximately 12' from the building. The remaining underground piping can be covered. I let the general contractor know that it would be a good idea to install conduit in the trench prior to bury for the monitoring of the tamper switch.
FIR08-00531 INSP-Final Inspection10/17/200810/17/200810/17/2008 3:07:12 PMPFAIL
This project is not ready for a final yet. This inspection was only for a sprinkler rough-in. The sanctuary is ok to cover except for the north soffit. It did not have the insulation installed by the contractor yet.
FIR08-00655 INSP-Final Inspection10/17/200810/17/200810/17/2008 3:04:18 PMPPASS
Permit finaled
BLD08-00572 FIRE-Final Inspection10/16/200810/17/200810/17/2008 3:03:34 PMAFAIL
The sprinkler pendants need to be modified. This work will require a permit. I spoke to Andrea about the issues. See the city approved plans for locations.
FIR08-00551 INSP-Sprinkler Rough-in/Hydro10/16/200810/17/200810/17/2008 12:19:03 PMAPASS
The overhead hydro tests for both the wet and the dry systems passed.
FIR08-00551 INSP-Supply line flush10/16/200810/17/200810/17/2008 12:18:23 PMAPASS
Underground flush passed
BLD07-02458 FIRE-Final Inspection10/16/200810/17/200810/17/2008 8:47:49 AMAPASS
Life safety passed
FIR08-00557 INSP-Final Inspection10/16/200810/17/200810/17/2008 8:47:14 AMAPASS
Permit finaled