Inspections for the day of: Monday, October 17, 2011.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-02288 FIRE-Final Inspection10/17/201110/17/201110/17/2011 3:52:55 PMPPASS
life safety passed
FIR11-00503 INSP-Final Inspection10/14/201110/17/201110/17/2011 3:16:56 PMPFAIL
Todays inspection was to finish up functional testing of the initiating devices. Due to my time constraints and only one contractor/tech we only had time to finish the second floor. Still need to check the portable classroom devices.
BLD11-01675 FIRE-Final Inspection10/14/201110/17/201110/17/2011 2:16:02 PMPFAIL
Provide functional testing of the smoke evac system. Provide annual tag for the fire extinguisher and finish installing doors and hardware.
BLD11-01890 FIRE-Final Inspection10/17/201110/17/201110/17/2011 2:15:16 PMPFAIL
Provide functional testing of the smoke evac system. Provide fire extinguisher and repair the emergency lighting.
FIR11-00515 INSP-Final Inspection10/17/201110/17/201110/17/2011 2:14:26 PMPPASS
permit finaled
FIR11-00423 INSP-Final Inspection10/17/201110/17/201110/17/2011 2:14:04 PMPPASS
permit finaled
BLD11-01636 FIRE-Final Inspection10/10/201110/17/201110/17/2011 1:10:27 PMAFAIL
Resubmit plans detailing basement use, repair the exit sign that was non-functional and provide automatic flush bolts on the inactive leaf of the main exit.
FIR11-00399 INSP-Final Inspection10/17/201110/17/201110/17/2011 11:08:23 AMPPASS
Permit finaled
FIR11-00514 INSP-Final Inspection10/17/201110/17/201110/17/2011 11:07:24 AMPPASS
Permit finaled
BLD11-02407 FIRE-Final Inspection10/14/201110/17/201110/17/2011 10:35:17 AMAPASS
Life safety passed. Fire extinguisher contractor is on his way to tag and mount the fire extinguisher.
BLD11-02292 FIRE-Final Inspection10/14/201110/17/201110/17/2011 10:10:47 AMAFAIL
Provide building address. Provide exit signs as discussed. Provide single action hardware on the west front door as discussed.
FIR11-00517 INSP-Sprinkler Rough-in/Hydro10/14/201110/17/201110/17/2011 9:16:52 AMAPASS
Only the IBR has been installed at this time. Piping is ok to cover.
BLD11-01844 FIRE-Final Inspection10/13/201110/17/201110/17/2011 8:00:41 AMAPASS
life safety passed