Inspections for the day of: Wednesday, October 17, 2012.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00684 BLD-Conference10/17/201210/17/201210/17/2012 4:06:20 PMPDONE
Went over horizontal assembly detail with sheet rock foreman.
BLD12-00684 BLD-Energy code compliance10/17/201210/17/201210/17/2012 4:04:57 PMPPASS
BLD11-00937 BLD-Final10/17/201210/17/201210/17/2012 2:56:25 PMPPART
kevin - call 30 mins prior to meet Phone #: ###-####. pending zoning.
BLD12-02223 BLD-Final10/17/201210/17/201210/17/2012 2:36:04 PMPDONE
>> Inspection requested via web by Stephanie White
BLD12-02223 DOC - Permit Finaled10/17/201210/17/201210/17/2012 2:35:54 PMPPASS
BLD12-02517 BLD-Final10/17/201210/17/201210/17/2012 1:24:05 PMPPASS
request 1pm//Harry Phone #: ###-####. QAll issues were resolved. ok for perm occ.
BLD12-02510 BLD-Foundation10/16/201210/17/201210/17/2012 11:57:22 AMAPART
request 10-11am inspection Phone #: ###-#### >> Inspection requested via web by Ben Sears. Basement walls and perimeter footings. Noted to concrete contractor to hold off o interior footings at interior basement wall until general contractor has either sumbitted a design mod for not backfilling at interior basement wall or will backfill at this location. Also noted that a reinspection is required.
ESC12-00955 Random Inspection10/17/201210/17/201210/17/2012 11:54:09 AMAPASS
BLD12-01161 BLD-Final10/16/201210/17/201210/17/2012 10:43:15 AMAFAIL
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Provide the required energy cert and post. Provide the blower door test result and post or the 3rd. party inspection airseal check report.
BLD12-01163 BLD-Final10/16/201210/17/201210/17/2012 10:35:56 AMAFAIL
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Provide the equired energy cert and post. Provide the blower door test result and post or the 3rd. party inspection checklist report. Correction notice posted.
BLD12-02004 BLD-Final10/16/201210/17/201210/17/2012 9:56:51 AMAFAIL
Please call with questions - Preston Phone #: ###-####. A landing is required a the door.
BLD12-02517 BLD-Final10/12/201210/17/201210/17/2012 9:44:56 AMAFAIL
harry - call 15 prior to meet Phone #: ###-####. Needs to provide the grab bars for the restroom to complete the 20% ada upgrade requierment as per the approved plans.
BLD12-02710 BLD-Final10/16/201210/17/201210/17/2012 9:22:28 AMAPASS
Tracey Phone #: ###-####. OK for perm occ.