Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02903 Electrical Rough-In10/17/201310/17/201310/17/2013 3:20:57 PMPPASS
Underground only - Clyde Phone #: ###-#### Under ground rough in ok cover
ELE10-01532 ELE-Aging Inspection10/17/201310/17/201310/17/2013 3:20:52 PM DONE
Still under construction
ELE12-01265 Final10/17/201310/17/201310/17/2013 1:35:43 PMPPASS
Sign final ok
ELE12-01265 Electrical Rough-In10/17/201310/17/201310/17/2013 1:29:13 PMPPASS
Sign rough in ok
ELE13-02780 Final10/16/201310/17/201310/17/2013 1:24:45 PMPPASS
Contact: Andy Eckhart ceiling/final inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Final ok
ELE13-02780 Electrical Rough-In10/17/201310/17/201310/17/2013 1:15:08 PMPPASS
Contact: Andy Eckhart ceiling/final inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Ceiling rough in ok cover
ELE13-02780 Electrical Rough-In10/17/201310/17/201310/17/2013 12:55:03 PMPPASS
Contact: Andy Eckhart ceiling/final inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Wall rough in ok cover 10-7-13
ELE13-01683 Electrical Rough-In10/16/201310/17/201310/17/2013 10:45:07 AMAPASS
KEVIN Phone #: ###-#### Sun room rough in ok cover
ELE13-02893 Final10/16/201310/17/201310/17/2013 10:15:50 AMAPASS
I will not be there. Jesse from Alt Energy will. Please call him when you''re headed there.{###-####) Thanks Phone #: ###-#### >> Inspection requested via web by Kevin Cowgill Final ok
ELE13-02893 Electrical Rough-In10/17/201310/17/201310/17/2013 10:15:34 AMPPASS
I will not be there. Jesse from Alt Energy will. Please call him when you''re headed there.{###-####) Thanks Phone #: ###-#### >> Inspection requested via web by Kevin Cowgill Solar rough in ok
ELE13-02691 Final10/16/201310/17/201310/17/2013 10:14:45 AMAPASS
Call Dave before you head out. He can swing by and let you inside to see the inverter. Thanks. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay Final ok
ELE13-02691 Electrical Rough-In10/17/201310/17/201310/17/2013 10:14:36 AMPPASS
Call Dave before you head out. He can swing by and let you inside to see the inverter. Thanks. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay Solar rough in ok
ELE13-02313 Electrical Rough-In10/17/201310/17/201310/17/2013 9:43:42 AMAPASS
Pharmacy ceiling and pharmacy entry ceiling Phone #: ###-#### >> Inspection requested via web by kendall bender Contractor to leave tile out of 1 spot to check receptical is removed in phamacy above grid by drive thru window. Ceiling rough in ok cover
ELE13-02228 Final10/16/201310/17/201310/17/2013 9:18:18 AMAFAIL
It will be unlocked. let me know if there are any problems. Thanks Phone #: ###-#### >> Inspection requested via web by Clay Morgan
410.16- Incandescent light fixture located in closet shall have 12" clearance from shelf.
440.14 - A disconnecting means shall be provided with in sight of AC unit.
210.8- All 15 and 20 amp 120 volt recepticals located in garage shall have GFCI protection.
210.52(C)(3)- At least one receptical outlet shall be installed at peninsula counter top space.
342.30- Service riser shall be secured with in 3' of meter can.
ELE13-02888 Temporary Service10/16/201310/17/201310/16/2013 2:52:24 PMAFAIL
Phone #: ###-#### >> Inspection requested via web by Bob Glenn 110.26- Minimum work clearance shall be provided for temp service