Inspections for the day of: Friday, October 17, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00344 INSP-Sprinkler Rough-in10/16/201410/17/201410/17/2014 5:20:17 PMPPART
Rough-in at building C 2nd floor completed. Items noted include; overspaced SW head at unit C206, coverage at mechanical, trash and storage rooms overspaced- install per design, plan modification necessary for field changes to 2" main and branchline layout, housekeeping room and 2" main in the corridor not yet installed. Previous C/N items done.
BLD14-00126 FIRE-Final Inspection10/17/201410/17/201410/17/2014 4:11:51 PMPPASS
FIR14-00531 INSP-Conference10/17/201410/17/201410/17/2014 4:06:56 PMAPART
FIR14-00686 INSP-Final Inspection10/17/201410/17/201410/17/2014 2:22:28 PMPNR
please call 1/2hour prior please Phone #: ###-#### Inspection requested via web by Rick Groom
FIR14-00639 INSP-Sprinkler Rough-in10/17/201410/17/201410/17/2014 1:50:14 PMPPART
Okay to cover remainder of fire sprinkler work at the core group of rooms with grid ceilings as marked and dated on approved plan. Need to provide a ceiling or extend walls to the deck at the mechanical room.
BLD14-00126 FIRE-Final Inspection10/17/201410/17/201410/17/2014 12:17:01 PMAPASS
Fire life safety finaled.
FIR14-00593 INSP-Final Inspection10/17/201410/17/201410/17/2014 12:15:06 PMAPASS
Inspection passed. Fire alarm permit finaled.
FIR14-00637 INSP-Final Inspection10/17/201410/17/201410/17/2014 12:14:20 PMAPASS
Fire alarm work passed inspection. Permit finaled.