BLD14-00211
| BLD-Final | 10/16/2014 | 10/17/2014 | 10/17/2014 4:58:08 PM | P | NR |
|
|
Denny Phone #: ###-####
|
BLD14-03020
| BLD-Framing/Rough-in | 10/16/2014 | 10/17/2014 | 10/17/2014 4:57:46 PM | P | FAIL |
|
|
late as possible, please call ahead coming from Nampa - Emmett Phone #: ###-####
|
BLD14-01508
| BLD-Final | 10/17/2014 | 10/17/2014 | 10/17/2014 2:22:18 PM | P | PASS |
|
|
Pat Phone #: ###-####. Ok for perm occ.
|
BLD14-01105
| BLD-Energy code compliance | 10/16/2014 | 10/17/2014 | 10/17/2014 1:48:18 PM | P | PASS |
|
|
Richard Phone #: ###-####
|
BLD14-02703
| BLD-Final | 10/16/2014 | 10/17/2014 | 10/17/2014 1:47:57 PM | P | PASS |
|
|
give 1/2 hr notice // Bill Phone #: ###-####. Ok for perm occ.
|
BLD14-02074
| BLD-Framing/Rough-in | 10/17/2014 | 10/17/2014 | 10/17/2014 1:47:33 PM | P | PASS |
|
|
Joshua Phone #: ###-####
|
BLD14-02074
| BLD-Energy code compliance | 10/17/2014 | 10/17/2014 | 10/17/2014 1:47:15 PM | P | PASS |
|
|
Joshua Phone #: ###-####
|
BLD13-00166
| BLD-Conference | 10/15/2014 | 10/17/2014 | 10/17/2014 11:00:28 AM | A | FAIL |
|
|
A five day notice was issued. All issues must be resolved with in 5 working days, 10-24-14.Per my discussion with Peter on 10-15-14, eelctrical and mech. permits need to be finaled. As of today, friday 10-17-14, the electrical and mech. permits are still open and no inspections have been scheduled. A plumbing permit still has not been isuued to date. As for the undersized waste system, per Bill Vandergrift, the engineer must be willing to accept and take resonsibility for the in place system as per Idaho State Plumbing code 301.4. Also the drinking fountain has not been installed, Doors to saunas not yet removed and bracing for newly built walls not installed all per the city approved plans. A correction notice was also issued and signed by Peter.
|
BLD14-02074
| BLD-Energy code compliance | 10/16/2014 | 10/17/2014 | 10/17/2014 9:03:27 AM | A | CANC |
|
|
Josh Phone #: ###-####. Still have outstanding framing issues.
|
BLD14-02074
| BLD-Framing/Rough-in | 10/16/2014 | 10/17/2014 | 10/17/2014 9:02:50 AM | A | FAIL |
|
|
Josh Phone #: ###-####. Full height roll blocking has not been completed.
|