ELE16-00877
| Final | 10/17/2016 | 10/17/2016 | 10/17/2016 2:14:27 PM | P | PASS |
|
|
corrections have been made call josh @ ###-#### for access some one staying there now Phone #: ###-#### Inspection requested via web by dennis mcneely Final ok
|
ELE13-01291
| Electrical Rough-In | 10/17/2016 | 10/17/2016 | 10/17/2016 1:32:28 PM | P | PASS |
|
|
underground site. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson Discussed progress on south egress lighting for stair 1. I was informed site crew not providing egress lighting. Asked site crew meet with building electrical foreman and double check who is providing lighting for egress as it is required. Partial underground south side west of tractors rough in ok cover.
|
ELE16-00089
| Electrical Rough-In | 10/15/2016 | 10/17/2016 | 10/17/2016 10:00:50 AM | A | PASS |
|
|
Call Pierce for inspection of heat trace in US bank building. Discuss ownership of heat trace on 3rd floor Parkin garage. Discuss readiness of final for CO of Districts. Phone #: ###-#### Inspection requested via web by Rafael Castillo Rough in of heat trace in US Bank building ok. Lea stated they will take responsibility for all orange heat trace installed by others. For final inspection all core and shell permits shall pass and 1/2' openings used for luminaire support shall be closed as per NEC 314.17
|
ELE16-03322
| Rough-In Permanent Service | 10/14/2016 | 10/17/2016 | 10/17/2016 8:51:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Rough in ok cover p/s u/g n ok Underground to service needs moved to connect to meter conduit
|