MEC16-04591
| Final | 10/14/2016 | 10/17/2016 | 10/17/2016 4:23:42 PM | P | PASS |
|
|
Installation of furnace. Requesting a final inspection after pressure test has been completed. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Kayla Pinkham
|
MEC16-04591
| Pressure Test | 10/14/2016 | 10/17/2016 | 10/17/2016 4:23:22 PM | P | PASS |
|
|
Installation of furnace. Pressure Test needed due to installation of high efficiency furnace. Also requested a final inspection after pressure test has been completed. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Kayla Pinkham- 5lb flue pass
|
MEC16-04579
| Rough-in | 10/17/2016 | 10/17/2016 | 10/17/2016 4:10:21 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek- corrections made
|
MEC16-04579
| Pressure Test | 10/17/2016 | 10/17/2016 | 10/17/2016 4:09:54 PM | P | PASS |
|
|
Max will call inspector when all corrections are completed, thank you Inspection requested via web by Floyd Floyd Peek- 20lb gas pass- 5lb flue pass
|
MEC16-04558
| Pressure Test | 10/13/2016 | 10/17/2016 | 10/17/2016 3:56:18 PM | P | PART |
|
|
Shaun: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello 20lb gas pass
5lb flue for 2 furnaces pass
5lb flue for water heater at 1.5 lbs
|
MEC16-04558
| Rough-in | 10/13/2016 | 10/17/2016 | 10/17/2016 3:37:18 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Frank Marturello- 5lb flue for nwater heater at 1.5lbs- left correction notice on front window
|
MEC16-03380
| Final | 10/15/2016 | 10/17/2016 | 10/17/2016 2:31:41 PM | P | PASS |
|
|
Please call homeowner, John Fahrer ###-#### when heading his way, he will meet you. Thanks! Inspection requested via web by Floyd Floyd Peek
|
MEC16-04588
| Pressure Test | 10/17/2016 | 10/17/2016 | 10/17/2016 1:22:04 PM | P | PASS |
|
|
Early PM. Thank you Phone #: ###-#### Inspection requested via web by Xanti Berria- should have been final- 20lb gas pass
|
MEC16-04588
| Final | 10/17/2016 | 10/17/2016 | 10/17/2016 1:21:36 PM | P | PASS |
|
|
Early PM. Thank you Phone #: ###-#### Inspection requested via web by Xanti Berria - 20lb gas pass
|
MEC15-04600
| Mec-Aging Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 11:26:03 AM | | CANC |
|
|
called contractor about permit on hold- she is going to look into this-
|
MEC15-00640
| Mec-Aging Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 11:25:04 AM | | DONE |
|
|
expired
|
MEC15-00640
| DOC - Permit Expired | 10/17/2016 | 10/17/2016 | 10/17/2016 11:24:28 AM | P | PASS |
|
|
|
MEC16-03793
| Final | 10/11/2016 | 10/17/2016 | 10/17/2016 11:21:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC16-04594
| Rough-in | 10/14/2016 | 10/17/2016 | 10/17/2016 11:06:46 AM | A | FAIL |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- dryer vent at roof missing tape on one seam- both flue guages at 0 psi garage and attic- left notice on front window off entry
|
MEC16-04594
| Pressure Test | 10/14/2016 | 10/17/2016 | 10/17/2016 11:04:59 AM | A | PASS |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- 20lb gas pass
|
MEC16-02174
| Rough-in | 10/14/2016 | 10/17/2016 | 10/17/2016 10:04:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth area AB bathrooms and showers seal ok- ok to insulate duct
area AC ok to install ceiling grid
|
MEC16-04579
| Rough-in | 10/17/2016 | 10/17/2016 | 10/17/2016 9:33:16 AM | A | FAIL |
|
|
Inspection requested via web by Floyd Floyd Peek exhaust flex to bath fans need hooked up
flue guage at 0 psi
1" clearance to insulation shield to b vent and secured so cant move
gas line needs protection where penetrates foundation- retest
register boots need sealed
outside air cant be taken from roof
|
MEC16-04579
| Pressure Test | 10/17/2016 | 10/17/2016 | 10/17/2016 9:27:37 AM | A | FAIL |
|
|
Thanks, call Max at ###-#### if you need anything Inspection requested via web by Floyd Floyd Peek- gas line thru foundation needs protection- retest after fixed
|
MEC16-04381
| Final | 10/14/2016 | 10/17/2016 | 10/17/2016 8:53:46 AM | A | PASS |
|
|
Hood is running and ready to be signed off on. I will have a guy there. 8:30 a.m. should be good to go. Phone #: ###-#### Inspection requested via web by Drew Tverdy
|