ELE16-01134
| Electrical Rough-In | 10/17/2016 | 10/17/2016 | 10/17/2016 2:13:53 PM | P | PASS |
|
|
We are requesting a rough-in inspection stair one for this afternoon. Our contact is Nic @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate 8th floor stair 1 ok to pour
|
ELE16-02717
| Final | 10/17/2016 | 10/17/2016 | 10/17/2016 1:30:10 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl 210.8 All 120v receptacles in garages and exterior(front w/p)shall have GFCI protection
|
ESC16-00872
| Site Final | 10/17/2016 | 10/17/2016 | 10/17/2016 1:12:04 PM | P | PASS |
|
|
Site final ok
|
ELE16-02600
| Electrical Rough-In | 10/14/2016 | 10/17/2016 | 10/17/2016 10:00:27 AM | A | PASS |
|
|
4th Floor wall cover capital side. Phone #: ###-#### Inspection requested via web by Sean DeLacy 3rd floor corridor on myrtle side only/4th floor as marked on inspection record ok cover
|