MEC16-04417
| Rough-in | 10/16/2016 | 10/17/2016 | 10/17/2016 4:38:59 PM | P | PASS |
|
|
Inspection requested via web by Oleg Chervak
|
MEC16-00033
| Mec-Aging Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 4:07:11 PM | | PEND |
|
|
|
MEC16-00660
| Mec-Aging Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 4:05:28 PM | | PEND |
|
|
|
MEC16-03330
| Final | 10/17/2016 | 10/17/2016 | 10/17/2016 3:46:01 PM | P | PASS |
|
|
Please call Daryl with any questions. Phone #: ###-#### Inspection requested via web by Diane Day
|
MEC16-04573
| Final | 10/14/2016 | 10/17/2016 | 10/17/2016 3:31:39 PM | P | PASS |
|
|
Would like a late pm inspection, install is being done same day Inspection requested via web by Rick Montgomery
|
MEC16-01431
| Rough-in | 10/16/2016 | 10/17/2016 | 10/17/2016 2:54:10 PM | P | PART |
|
|
Rough Mechanical for cover. Thanks, Brad Phone #: ###-#### Inspection requested via web by Victoria Craig fireplace ok, flash shield gas pipe and fittings are not connected per manufactures instructions
|
MEC16-04572
| Final | 10/17/2016 | 10/17/2016 | 10/17/2016 2:36:54 PM | P | PASS |
|
|
Call homeowner@###-#### to coordinate inspection time but they will be available this afternoon. Call HVAC supervisor Eric@###-#### with any installation/inspection issues. Phone #: ###-#### Inspection requested via web by Kayla Pinkham
|
MEC16-04431
| Pressure Test | 10/17/2016 | 10/17/2016 | 10/17/2016 1:44:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan McFate 20lb gas
|
MEC16-04202
| Rough-in | 10/16/2016 | 10/17/2016 | 10/17/2016 1:27:04 PM | P | PART |
|
|
Please call Aaron with any questions Phone #: ###-#### Inspection requested via web by john shay 60,20,lb gas 5lb flue x7 roughin only system in the crawl remains
|
MEC16-02209
| Final | 10/16/2016 | 10/17/2016 | 10/17/2016 11:44:31 AM | A | FAIL |
|
|
Inspection requested via web by Oleg Chervak arma flex needs uv protection
|
MEC16-02564
| Final | 10/16/2016 | 10/17/2016 | 10/17/2016 11:43:30 AM | A | PASS |
|
|
Inspection requested via web by Oleg Chervak
|
MEC16-04530
| Final | 10/14/2016 | 10/17/2016 | 10/17/2016 10:57:35 AM | A | PASS |
|
|
Dean Phone #: ###-####
|
MEC16-03173
| Rough-in | 10/17/2016 | 10/17/2016 | 10/17/2016 10:57:34 AM | A | PART |
|
|
Request for cover inspection 1st floor. Please contact job lead, Chris at ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery 1st floor ok for cover
|
MEC16-04417
| Conference | 10/16/2016 | 10/17/2016 | 10/17/2016 8:43:19 AM | A | CANC |
|
|
Inspection requested via web by Oleg Chervak
|
MEC16-04542
| Final | 10/13/2016 | 10/17/2016 | 10/17/2016 8:35:31 AM | A | PASS |
|
|
home owner will be ready at 8:30 pressure test for tankless WH piping under 6 ft
|
MEC16-04499
| Pressure Test | 10/10/2016 | 10/17/2016 | 10/17/2016 8:17:08 AM | A | CANC |
|
|
Late AM inspection please Installer: Alberto ###-#### Thank you Phone #: ###-#### >> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|
MEC16-04499
| Final | 10/10/2016 | 10/17/2016 | 10/17/2016 8:17:05 AM | A | CANC |
|
|
Late AM inspection please Installer: Alberto ###-#### Thank you Phone #: ###-#### >> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|