ELE10-01957
| ELE-Aging Inspection | 10/17/2018 | 10/17/2018 | 10/18/2018 7:15:18 AM | | DONE |
|
|
Please schedule a final inspection..
|
ELE18-02313
| Conference | 10/17/2018 | 10/17/2018 | 10/17/2018 2:22:46 PM | P | DONE |
|
|
We need a consult for rough in for the gym area. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Discussed conduits runs below corrugated ceiling, clearances from.
|
ELE18-03963
| Rough-In Permanent Service | 10/16/2018 | 10/17/2018 | 10/17/2018 2:20:39 PM | P | PASS |
|
|
Shop rough in Phone #: ###-#### Inspection requested via web by Emmet Bushman p/s u/g n ok
|
ELE18-03975
| Permanent Service | 10/17/2018 | 10/17/2018 | 10/17/2018 2:12:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric p/s u/g rec ok
|
ELE18-03973
| Final | 10/16/2018 | 10/17/2018 | 10/17/2018 1:44:52 PM | P | PASS |
|
|
replacing an existing breaker panel to repair this problem. Phone #: ###-#### Inspection requested via web by Andy Derrick Ok final.
|
ELE18-03766
| Electrical Rough-In | 10/16/2018 | 10/17/2018 | 10/17/2018 12:14:15 PM | P | PASS |
|
|
Call Foreman (Brad Hallman) 30-60 min prior to arrival. Phone #: ###-#### Inspection requested via web by Rob Maes Ok cover. All items UL listed. DC system.
|
ELE18-03947
| Electrical Rough-In | 10/16/2018 | 10/17/2018 | 10/17/2018 11:31:02 AM | A | PASS |
|
|
kitchen and hall remodel. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover kitchen and end of hall S side.
|
ELE18-03907
| Permanent Service | 10/16/2018 | 10/17/2018 | 10/17/2018 11:08:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Winters LLC p/s u/g rec ok
|
ELE18-01879
| Final | 10/16/2018 | 10/17/2018 | 10/17/2018 11:07:59 AM | A | PASS |
|
|
Please call Jimmy. Phone #: ###-#### Inspection requested via web by Kevin Perez Ok final. A few offices did not have OC sensors or VAC sensors. Let contractor know that building inspector may require installation.
|
ELE18-03764
| Electrical Rough-In | 10/16/2018 | 10/17/2018 | 10/17/2018 10:20:48 AM | A | PASS |
|
|
call access- Jason Phone #: ###-#### Ok cover kitchen, utility and ceilings throughout. Smoke det added, and wiring in garage.
|
ELE17-02201
| Final | 10/16/2018 | 10/17/2018 | 10/17/2018 9:50:34 AM | A | NR |
|
|
James Phone #: ###-#### 100a breaker installed in a 100a meter main to feed a shop. Asked homeowner to produce a load calculation for house and shop. Will probably need to be replaced with 60a brkr to feed shop.
|
ELE18-03966
| Permanent Service | 10/17/2018 | 10/17/2018 | 10/17/2018 8:22:46 AM | P | CANC |
|
|
Idaho power will be on site at 10;30 to shut down, work should be done by 2:00 ready for inspection, Idaho power will turn back on after inspection. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Inspection cancelled from web by: Kurt Carlson
|
ELE18-03954
| Electrical Rough-In | 10/16/2018 | 10/17/2018 | 10/17/2018 7:59:18 AM | A | CANC |
|
|
For access please call Jaman 1/2 hr prior to inspection.###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Inspection already approved for cover.
|