FIR18-00435
| INSP-Conference | 10/17/2018 | 10/17/2018 | 10/17/2018 1:57:55 PM | P | DONE |
|
|
Tom and I discussed items that needed corrected.
|
FIR18-00414
| INSP-Sprinkler Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 1:34:18 PM | A | PART |
|
|
Main floor is complete except for the soffits at the ESFR heads. The second floor ceiling tile needs to be removed for a rough-in inspection.
Jordan Fuger is the contact for this RTC inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-00616
| FIRE-Final Inspection | 10/17/2018 | 10/17/2018 | 10/17/2018 1:01:05 PM | P | PASS |
|
|
life safety passed
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
FIR18-00780
| INSP-Final Inspection | 10/16/2018 | 10/17/2018 | 10/17/2018 9:51:54 AM | A | PASS |
|
|
Permit finaled
Robert Phone #: ###-####
|