Inspections for the day of: Friday, October 18, 1996.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM96-02697 INSP - Final10/18/199610/18/199610/18/1996 12:00:00 AM PASS
/ / 330 -
PLM96-03108 INSP - Plumbing Rough-in10/18/199610/18/199610/18/1996 12:00:00 AM PASS
/ / 330 -
PLM96-03141 INSP - Sprinkler & Backflow10/18/199610/18/199610/18/1996 12:00:00 AM PASS
/ / 330 -
PLM96-03086 INSP - Water heater (elec)10/16/199610/18/199610/18/1996 12:00:00 AMAPASS
10/18/96 330 - APPT. FOR 11:30
PLM96-03108 INSP - Plumbing Rough-in10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 - did this in the am
PLM96-03126 INSP - Final10/18/199610/18/199610/18/1996 12:00:00 AMPNR
10/18/96 330 - FAB 3 this was a mech permit
PLM96-03138 INSP - Sewer/Water lines-FINAL10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 - READY AT 2:20 ì
PLM96-03141 INSP - Sprinkler & Backflow10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 - WILL CALL AND SEE IF YOU CAN COME OUT THIS MORNING did this inthe am
PLM96-03073 INSP - Plumbing Rough-in10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 - RE-INSPECTION ì
PLM96-02260 INSP - Final10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 -
PLM96-02592 INSP - Plumbing Rough-in10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 - master shower tub valve wall is being furred out 2 1/2" t insulation. r/i ok
PLM96-02697 INSP - Final10/18/199610/18/199610/18/1996 12:00:00 AMPPASS
10/18/96 330 - RE-INSPECTION SPRINKLER PERMIT PULLED AT 9:55AM -- THEY WILL CALL YOU ABOUT INSPECTING SPRINKLER SYSTEM AM did this in the am