BLD99-02788
| BLD-Framing/Rough-in | 10/15/1999 | 10/18/1999 | 10/19/1999 12:00:00 AM | P | NR |
|
|
tom ###-####
|
BLD99-00893
| BLD-Final | 10/15/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | A | PASS |
|
|
john ###-#### Passed by Russ Owens 10/15/99
|
BLD99-01896
| BLD-Framing/Rough-in | 10/15/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/15/1999 at 14:46:39. Contact: ###-####. $42.00 reinspections fees due
|
BLD99-02738
| BLD-Framing/Rough-in | 10/15/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | A | PART |
|
|
WALT GAMMIL ###-#### FR Need engineering connections of I Beam to single plate
|
BLD99-02641
| BLD-Footing | 10/15/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | P | FAIL |
|
|
cLINT ###-#### BEEP 14236 need Engineer's soil acceptance letter, details on stepped footing and within 10' of the top of the slope.
|
MEC99-03359
| Final | 10/18/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | P | FAIL |
|
|
shawna-- ###-#### fn --fireplace Unable to access
|
BLD99-02051
| BLD-Framing/Rough-in | 10/18/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | P | FAIL |
|
|
joel ###-#### 1hr const. Not to plan ck notes, not to 1hr constr. Criteria
|
BLD99-03052
| BLD-Foundation | 10/18/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | P | PASS |
|
|
tom ---###-#### found
|
MEC99-01305
| Final | 10/18/1999 | 10/18/1999 | 10/18/1999 12:00:00 AM | P | PART |
|
|
russ-- ###-#### fn insp CK range hood switch @ bldg. Final
|