BLD00-01563
| BLD-Concrete | 10/16/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:17:56. Contact: ###-####. placed with special insp. pending 10/18/2000 3:14:33 PM report 10/18/2000 3:14:36 PM . 10/18/2000 3:14:40 PM
|
BLD00-01783
| BLD-Footing | 10/17/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 16:24:03. Contact: ###-####. 1-4 a line ok pending s/i report. 10/18/2000 3:06:16 PM
|
BLD00-02513
| BLD-Framing/Rough-in | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PASS |
|
|
shear randy ###-#### interior ok 10/18/2000 3:14:12 PM
|
BLD00-02418
| BLD-Final | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | CANC |
|
|
reinspection scott ###-####
|