Inspections for the day of: Wednesday, October 18, 2000.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Schmer
TitleELE-CHIEF INSPECTOR
Phone #794-9423
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-04035 Final10/18/200010/18/200010/18/2000 12:00:00 AMPPART
MITCH CALL 1ST BEFORE INSP ###-#### FN -- conference (corr. 250-148 all grds bond to j-box, 250 grd. from 2nd ser. to outside 1st. grd wire, 250 grd rod flush with surface)
ELE00-03894 Electrical Rough-In10/18/200010/18/200010/18/2000 12:00:00 AMPPASS
UFFER GROUND --ALLEN--- ###-#### ok to pour concrete - do not cover until next inspection