ELE99-04608
| Final | 10/17/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | A | FAIL |
|
|
FN MARK ###-#### disconnect for wathe heater open wires and cover missing 10/18/2000 11:37:01 AM
|
ELE00-04027
| Permanent Service | 10/17/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | A | PASS |
|
|
Don ###-####
|
ELE00-03330
| Final | 10/17/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Locked out called got answering mach. left message contractor called and will reschedual 10/18/2000 11:38:29 AM 10/18/2000 11:38:59 AM
|
ELE00-02914
| Final | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PASS |
|
|
John ###-####
|
ELE00-03833
| Final | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PASS |
|
|
FN MITCH ###-####
|
ELE00-04033
| Electrical Rough-In | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 09:50:53. Contact: ###-####.
|
ELE00-04038
| Final | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | FAIL |
|
|
MITCH ###-#### FN connect grounding electrode to neutral and install stiff leg 10/18/2000 4:44:40 PM
|
ELE99-04608
| Final | 10/18/2000 | 10/18/2000 | 10/18/2000 12:00:00 AM | P | PASS |
|
|
reinspection Mark ###-####
|