PLM01-02405
| PLM-Aging Inspection | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | | PART |
|
|
90 more 10/18/2001 11:36:37 AM
|
PLM01-02414
| PLM-Aging Inspection | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | | PART |
|
|
90 more 10/18/2001 11:35:42 AM
|
PLM01-02410
| PLM-Aging Inspection | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | | PART |
|
|
90 more 10/18/2001 11:34:28 AM
|
PLM01-02314
| PLM-Aging Inspection | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | | PART |
|
|
90 more 10/18/2001 11:42:04 AM
|
PLM01-02022
| PLM-Aging Inspection | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | | PART |
|
|
90 more 10/18/2001 11:45:09 AM
|
PLM01-03561
| Water and/or Sewer | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PART |
|
|
chris-- ###-#### test ok will re-schedule for later on tie in. 10/18/2001 11:28:24 AM
|
PLM01-01103
| Final | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 13:59:00. Contact: ###-####.
access DST on lockbox ; add backflow valve for fire system to plumbers permit and I wrote a correction to reinstall it properly and test and call for reinspect. Fire sprinkler contractor apparantly relocated the backflow valve illegally without having plumber do it then reinstalled it incorrectly and with out re testing it. Talked to Jeff at Debest and told him what to do to get it to pass......the end....I hope. 10/18/2001 12:54:52 PM
|
PLM01-03559
| Water and/or Sewer | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 10/17/2001 3:48:53 PM will call when ready : partial ok to cover. buiding to concrete. still needs test. 10/18/2001 10:44:29 AM
|
PLM01-02762
| Plumbing Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 17:11:46. Contact: ###-####.this was wrong permit and wasn't ready anyway. Had Linda get me correct permit number and charge a re-inspect fee. I will sheddule the reinspect for this p.m. on the correct permit. 10/18/2001 11:31:00 AM
|
PLM01-03578
| Sprinkler (Final) | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | CANC |
|
|
brian ###-####
|
PLM01-03580
| Sprinkler (Final) | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
brian ###-####
|
PLM01-03580
| Sprinkler (Final) | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
brian ###-####
|
PLM01-03581
| Sprinkler (Final) | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
brian ###-####
|
PLM01-03581
| Sprinkler (Final) | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
brian ###-####
|
PLM01-03583
| Plumbing Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-03584
| Water and/or Sewer | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | CANC |
|
|
###-#### CHARLES
|
PLM01-03559
| Water and/or Sewer | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 309 On 10/18/2001 10:44:55 AM
|
PLM01-03583
| Plumbing Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 309 On 10/18/2001 11:22:18 AM
|
PLM01-03583
| Plumbing Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 309 On 10/18/2001 11:47:09 AM
|