MEC01-03113
| Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | NR |
|
|
###-####
|
BLD01-01353
| BLD-Final | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PASS |
|
|
###-####c. of c #20615 issued. 10/18/2001 11:07:52 AM
|
MEC01-03065
| Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PASS |
|
|
###-#### RANDY
|
BLD01-01893
| BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PASS |
|
|
fr insp justin ###-####- fr for house for gar shear ok to insulate house, and to side garage. 10/18/2001 9:16:02 AM
|
BLD01-02269
| BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PASS |
|
|
shear for gar justing ###-#### SHEAR--OK TO SIDE 10/18/2001 9:16:40 AM
|
BLD01-02391
| BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | FAIL |
|
|
Reviewed plans with contractor--Need to install MST straps per plans, nail shear panels --call for re-inspection. 10/18/2001 10:05:49 AM
|
BLD01-02589
| BLD-Foundation | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | A | PART |
|
|
###-#### JERAD wip 10/18/2001 10:20:37 AM
|
BLD01-00432
| BLD-Final | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 11:42:00. Contact: ###-####. c. of c. #20618 issued 10/18/2001 3:13:09 PM
|
BLD01-02090
| BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 12:42:32. Contact: ###-####. Ok to cover except back room ceiling--penetrations through 1-hr wall at rear needs to have fire assemblies inspeciton . 10/18/2001 3:57:02 PM
|
BLD01-02262
| BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PART |
|
|
fr bob ###-#### partial completion of prior c/n--fireblocking still needed at two location of roof line on 2nd floor. 10/18/2001 1:56:34 PM
|
BLD01-02451
| BLD-Concrete | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PART |
|
|
###-#### MIKE SSTB anchor bolts tie in place, 75% of walls completed--no interior footings will be poured under slab in the basement at this time--this will be done at the flat work. 10/18/2001 2:43:11 PM
|
BLD01-00068
| BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | CANC |
|
|
###-#### Cancelled by contractor 10/18/2001 1:09:22 PM
|
BLD00-01949
| BLD-Final | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 09:41:32. Contact: ###-####. c. of c. #20617 10/18/2001 1:25:27 PM
|
BLD01-01129
| BLD-Final | 10/18/2001 | 10/18/2001 | 10/18/2001 12:00:00 AM | P | PASS |
|
|
###-#### garage code 7010 c. of c. #20616 issued. 10/18/2001 2:16:32 PM
|