Inspections for the day of: Thursday, October 18, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-03113 Rough-in10/17/200110/18/200110/18/2001 12:00:00 AMANR
###-####
BLD01-01353 BLD-Final10/17/200110/18/200110/18/2001 12:00:00 AMAPASS
###-####c. of c #20615 issued. 10/18/2001 11:07:52 AM
MEC01-03065 Rough-in10/17/200110/18/200110/18/2001 12:00:00 AMAPASS
###-#### RANDY
BLD01-01893 BLD-Framing/Rough-in10/17/200110/18/200110/18/2001 12:00:00 AMAPASS
fr insp justin ###-####- fr for house for gar shear ok to insulate house, and to side garage. 10/18/2001 9:16:02 AM
BLD01-02269 BLD-Framing/Rough-in10/17/200110/18/200110/18/2001 12:00:00 AMAPASS
shear for gar justing ###-#### SHEAR--OK TO SIDE 10/18/2001 9:16:40 AM
BLD01-02391 BLD-Framing/Rough-in10/17/200110/18/200110/18/2001 12:00:00 AMAFAIL
Reviewed plans with contractor--Need to install MST straps per plans, nail shear panels --call for re-inspection. 10/18/2001 10:05:49 AM
BLD01-02589 BLD-Foundation10/17/200110/18/200110/18/2001 12:00:00 AMAPART
###-#### JERAD wip 10/18/2001 10:20:37 AM
BLD01-00432 BLD-Final10/17/200110/18/200110/18/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/17/2001 at 11:42:00. Contact: ###-####. c. of c. #20618 issued 10/18/2001 3:13:09 PM
BLD01-02090 BLD-Framing/Rough-in10/17/200110/18/200110/18/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/17/2001 at 12:42:32. Contact: ###-####. Ok to cover except back room ceiling--penetrations through 1-hr wall at rear needs to have fire assemblies inspeciton . 10/18/2001 3:57:02 PM
BLD01-02262 BLD-Framing/Rough-in10/18/200110/18/200110/18/2001 12:00:00 AMPPART
fr bob ###-#### partial completion of prior c/n--fireblocking still needed at two location of roof line on 2nd floor. 10/18/2001 1:56:34 PM
BLD01-02451 BLD-Concrete10/18/200110/18/200110/18/2001 12:00:00 AMPPART
###-#### MIKE SSTB anchor bolts tie in place, 75% of walls completed--no interior footings will be poured under slab in the basement at this time--this will be done at the flat work. 10/18/2001 2:43:11 PM
BLD01-00068 BLD-Framing/Rough-in10/18/200110/18/200110/18/2001 12:00:00 AMPCANC
###-#### Cancelled by contractor 10/18/2001 1:09:22 PM
BLD00-01949 BLD-Final10/18/200110/18/200110/18/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/18/2001 at 09:41:32. Contact: ###-####. c. of c. #20617 10/18/2001 1:25:27 PM
BLD01-01129 BLD-Final10/18/200110/18/200110/18/2001 12:00:00 AMPPASS
###-#### garage code 7010 c. of c. #20616 issued. 10/18/2001 2:16:32 PM