Inspections for the day of: Tuesday, October 18, 2005.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-00627 FIRE-Final Inspection10/18/200510/18/200510/18/2005 4:42:18 PMPPART
Per Boise Fire Dept the new area in Micheals is ok to occupy.
FIR05-00651 INSP-Final Inspection10/17/200510/18/200510/18/2005 4:41:41 PMAPART
Fire alarm panel, duct smoke detectors in new area, one duct detector in existing area and a/v's in Micheals have been tested. No other items tested. The existing duct smoke detectors need proven that they function as installed or they will need relocated. New area of Micheals is ok to occupy with fire dept. permission.
FIR05-00523 INSP-Sprinkler Rough-in10/17/200510/18/200510/18/2005 4:38:44 PMAPASS
Piping above the lay-in ceiling tiles is ok to cover except for the new anti-freeze system piping which has not been approved yet. Also the restrooms in the southwest corner are not to be covered until the new uprigth sprinklers are inspected.
BLD05-01794 FIRE-Final Inspection10/17/200510/18/200510/18/2005 1:37:22 PMAPASS
Fire life safety finaled. Letter for exiting thruough this space turn into plan review
BLD04-03017 FIRE-Final Inspection10/17/200510/18/200510/18/2005 11:25:18 AMAPASS
Life safety finaled
FIR05-00565 INSP-Final Inspection10/17/200510/18/200510/18/2005 11:15:05 AMAPART
Overspacing has been corrected. Sprinkler piping is ok to cover.
FIR05-00586 INSP-Sprinkler Rough-in10/17/200510/18/200510/18/2005 10:54:27 AMAPART
The rest of the underground supply piping is ok to cover. The installation of the 6" gate valve and road box will need to be verified when United Water finishes the underground tie-in. I pointed out to the sprinkler contractor that there are concealed combustible spaces throughout the entire canopy system that do not have sprinkler protection and will need addressed prior to finaling the permit. This was not an overhead inspection just underground today.