Inspections for the day of: Wednesday, October 18, 2006.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00637 INSP-Final Inspection10/18/200610/18/200610/18/2006 4:02:24 PMPFAIL
No all sprinkler work was complete. Will be called in for inspection tomorrow with life safety.
FIR06-00636 INSP-Final Inspection10/18/200610/18/200610/18/2006 4:01:06 PMPFAIL
No all sprinkler work was complete. Will be called in for inspection tomorrow with life safety.
FIR06-00635 INSP-Final Inspection10/18/200610/18/200610/18/2006 4:00:50 PMPFAIL
No all sprinkler work was complete. Will be called in for inspection tomorrow with life safety.
FIR06-00634 INSP-Final Inspection10/18/200610/18/200610/18/2006 4:00:35 PMPFAIL
No all sprinkler work was complete. Will be called in for inspection tomorrow with life safety.
FIR06-00633 INSP-Final Inspection10/18/200610/18/200610/18/2006 4:00:18 PMPFAIL
No all sprinkler work was complete. Will be called in for inspection tomorrow with life safety.
FIR06-00632 INSP-Final Inspection10/18/200610/18/200610/18/2006 3:57:47 PMPFAIL
No all sprinkler work was complete. Will be called in for inspection tomorrow with life safety.
FIR06-00137 INSP-Final Inspection10/17/200610/18/200610/18/2006 2:40:07 PMPCANC
John said to cancel until the fire alarm is ready to be inspected.
FIR06-00684 INSP-Sprinkler Rough-in10/16/200610/18/200610/18/2006 2:39:20 PMPFAIL
Plans do not match installation. Per Leroy the as-builts have been faxed downtown. I let him know that faxed as-builts won't be accepted. Especially faxed plans that have to be picked up downtown. The as-builts, had they been full size and on the job site would not have been accepted by me due to the amount of changes from the approved to the installed product. Leroy's shop drawings don't match either set. Resubmittals are going to be required.
FIR06-00492 INSP-Final Inspection10/17/200610/18/200610/18/2006 2:31:16 PMACANC
Phil wanted to reschedule for tommorrow
BLD06-02229 FIRE-Final Inspection10/17/200610/18/200610/18/2006 2:30:41 PMAFAIL
smoke evac system failed and fire sprinklers were not ready.
BLD06-02228 FIRE-Final Inspection10/17/200610/18/200610/18/2006 2:30:20 PMAFAIL
smoke evac system failed and fire sprinklers were not ready.
BLD06-02227 FIRE-Final Inspection10/17/200610/18/200610/18/2006 2:30:05 PMAFAIL
smoke evac system failed and fire sprinklers were not ready.
BLD06-02230 FIRE-Final Inspection10/17/200610/18/200610/18/2006 2:29:49 PMAFAIL
smoke evac system failed and fire sprinklers were not ready.
BLD06-02202 FIRE-Final Inspection10/17/200610/18/200610/18/2006 2:28:58 PMAFAIL
the only items that were ready to look at were the emergency lights, exit signs and the smoke evac system which all passed. The fire extinguisher was not hung or tagged and the door hardware was not installed. Ceiling tile was missing from the back room.
FIR06-00686 INSP-Final Inspection10/17/200610/18/200610/18/2006 2:26:02 PMAFAIL
sprinkler canopies are missing and ceiling tiles are missing.
BLD06-01692 FIRE-Final Inspection10/17/200610/18/200610/18/2006 2:09:23 PMAFAIL
Mount fire extinguishers and provide one additional emergency light as discussed.
FIR06-00628 INSP-Supply line flush10/17/200610/18/200610/18/2006 2:08:46 PMAPASS
Underground flush passed.
FIR06-00730 INSP-Final Inspection10/18/200610/18/200610/18/2006 2:08:23 PMPFAIL
Inspection was for a piping rough-in not a final. Sprinkler piping is ok to cover. Still need to add the pendant head in the "cloud" as per the approved plans. It does not appear that any of the surrounding heads will provide adequate coverage