Inspections for the day of: Thursday, October 18, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC07-03625 Final10/18/200710/18/200710/19/2007 9:09:12 AMPPASS
PLEASE SCHEDULE A FINAL INSPECTION FOR LATE PM, THANKS. Phone #: ###-#### Internet Inspection Request from: Rachael Ingham
MEC07-03590 Pressure Test10/17/200710/18/200710/18/2007 3:00:00 PMPPASS
TROY, PLEASE CALL INSTALLER 1ST, NEED PRESSURE LATE PM, THANKS Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe 20# test ok
MEC07-03540 Rough-in10/18/200710/18/200710/18/2007 2:20:41 PMPPASS
Please call Steffen at ###-#### for any questions. Phone #: ###-#### Internet Inspection Request from: bryan taylor ri ok 20# test ok.
MEC07-03388 Pressure Test10/18/200710/18/200710/18/2007 2:06:12 PMPPASS
B J Please call after inspection so he can call Gas company Phone #: ###-#### 20# test ok
MEC07-03602 Rough-in10/18/200710/18/200710/18/2007 11:30:27 AMPPASS
rick Phone #: ###-#### ri ok 20# test ok
MEC07-03654 Final10/17/200710/18/200710/18/2007 11:05:35 AMAPASS
Please call David before going out. Sam was installer. If you have any questions please feel free to call him @ ###-####. Thank you!! Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
MEC07-03402 Pressure Test10/17/200710/18/200710/18/2007 10:49:16 AMAPASS
Please inspect as early as possible. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims 20# test ok
MEC07-03402 Rough-in10/17/200710/18/200710/18/2007 10:48:53 AMAPASS
Please inspect as early as possible. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims
MEC07-03633 Final10/17/200710/18/200710/18/2007 10:04:14 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Frank Marturello
MEC07-03508 Rough-in10/17/200710/18/200710/18/2007 9:49:19 AMAFAIL
Need rough in inspection and gas pressure test. If there is anyway to get that inspection today that would be great, but if not we will wait till tomorrow. Thank you. Phone #: ###-#### Internet Inspection Request from: Nicole Pulley insulate supply fittings in the attic, vapor barrier required. 20# gas test required, permit gas test.
MEC07-03513 Rough-in10/17/200710/18/200710/18/2007 9:00:04 AMAPASS
Scheduled by a contractor via Hello! on 10/17/2007 at 3:23:59 PM. Contact: ###-####. ri 20# test ok