PLM05-04309
| Med/Gas Systems | 10/17/2007 | 10/18/2007 | 10/18/2007 4:51:43 PM | P | PART |
|
|
24 hr pressure test on second floor test ok note oked temp for penthouse
|
PLM07-03419
| Water and/or Sewer | 10/17/2007 | 10/18/2007 | 10/18/2007 3:05:59 PM | P | PART |
|
|
digging, chipping, and laying pipe
|
PLM07-03372
| Roof Drains | 10/18/2007 | 10/18/2007 | 10/18/2007 3:01:30 PM | P | PASS |
|
|
stevin Phone #: ###-#### storm drain,s on east side of building test ok
|
PLM07-03274
| Water and/or Sewer | 10/18/2007 | 10/18/2007 | 10/18/2007 2:26:22 PM | P | FAIL |
|
|
DEAN Phone #: ###-#### test failed on water line
|
PLM07-03520
| Water and/or Sewer | 10/18/2007 | 10/18/2007 | 10/18/2007 1:48:09 PM | P | PART |
|
|
Tuffy Note: sewer only Phone #: ###-#### sewer line from grease interceptor location by west side of building to property line on fairview test ok
|
PLM07-03419
| Water and/or Sewer | 10/17/2007 | 10/18/2007 | 10/18/2007 12:11:21 PM | A | PART |
|
|
contractor spent morning digging and moving trench box in to position in trench no pipe installed this morning
|
PLM07-03516
| Plumbing Rough-in | 10/17/2007 | 10/18/2007 | 10/18/2007 9:45:13 AM | A | PASS |
|
|
ryan Phone #: ###-####
|