FIR10-00491
| INSP-Sprinkler Rough-in | 10/17/2010 | 10/18/2010 | 10/19/2010 2:09:57 PM | P | PASS |
|
|
This is just for area South of the new Full height wall. Sprinkler rough-in passed.
|
FIR10-00236
| INSP-Sprinkler Rough-in | 10/18/2010 | 10/18/2010 | 10/19/2010 2:09:05 PM | P | PASS |
|
|
Rick provided the insulation behind the beam as discussed. The soffit can be covered. Also the three sprinkler pendants located in the womens restroom are passed.
|
FIR10-00400
| INSP-Conference | 10/18/2010 | 10/18/2010 | 10/19/2010 8:34:24 AM | P | DONE |
|
|
Bill and I went over earthquake bracing. I told him if the earthquaking did not match plans then resubmittals of the seismic calculations would be required. We also talked about possible z-purlin manufacture approval for earthquake attachment.
|
BLD10-01911
| FIRE-Final Inspection | 10/15/2010 | 10/18/2010 | 10/18/2010 11:12:59 AM | A | PASS |
|
|
life safety passed.
|