Inspections for the day of: Thursday, October 18, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00684 BLD-Other10/18/201210/18/201210/19/2012 7:52:25 AMPPART
2nd floor horizontal assembly, base layers.
BLD12-01161 BLD-Final10/18/201210/18/201210/19/2012 7:51:21 AMPNR
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin
BLD12-01163 BLD-Final10/18/201210/18/201210/19/2012 7:51:05 AMPNR
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin
BLD12-02510 BLD-Conference10/18/201210/18/201210/18/2012 2:59:38 PMPPASS
To verify setback requirements are being met
BLD12-02510 DOC - Permit Finaled10/18/201210/18/201210/18/2012 2:59:29 PMPPASS
Retaing wall in question is ok.
MIS12-00097 DOC - Permit Finaled10/18/201210/18/201210/18/2012 2:59:00 PMPPASS
(This activity was added in error so we have changed the case status back to Issued.)
BLD12-02535 BLD-Framing/Rough-in10/17/201210/18/201210/18/2012 2:50:17 PMPPASS
building plans are in unit 103 Phone #: ###-#### >> Inspection requested via web by Layton Anderson. interior steel stud framed walls ok.
BLD12-01201 BLD-Conference10/17/201210/18/201210/18/2012 11:36:52 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Brian McCoy
BLD12-01201 DOC - Permit Finaled10/18/201210/18/201210/18/2012 11:36:44 AMPPASS
BLD12-02033 BLD-Final10/17/201210/18/201210/18/2012 10:45:16 AMAPASS
tim Phone #: ###-####. Ok for perm occ.
BLD12-02364 BLD-Framing/Rough-in10/17/201210/18/201210/18/2012 10:04:41 AMAPART
Eugene Phone #: ###-####. Needs to provide truss engineering and strap header for portal frame. Also noted that fotting and foundation system is existing, Homeowner had stated that this was completed approx. 16 years ago. No footing or foundation work or inspection was done or associated with this permit.
BLD12-00684 BLD-Other10/17/201210/18/201210/18/2012 9:42:53 AMAPASS
2nd. floor 1hr. horizontal assembly, base layer of 5/8 type x rock ok.