Inspections for the day of: Friday, October 18, 2013.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-02132 BLD-Framing/Rough-in10/17/201310/18/201310/21/2013 7:42:18 AMPCANC
Steve Phone #: ###-####
GCB12-00031 GCB-Framing10/18/201310/18/201310/18/2013 3:32:31 PMPPART
Bob ###-####. Ok to insulate. Still need 5/8type x behind tub on one side.
GCB12-00030 GCB-Framing10/18/201310/18/201310/18/2013 3:31:22 PMPPART
Bob ###-####. ok to insulate. Still need 5/type x rock behind tubs one side and mech. rough in inspection failed on unit#2.
BLD13-01402 BLD-Framing/Rough-in10/18/201310/18/201310/18/2013 2:03:31 PMPPASS
Rick-Please call at least 30 mins prior to insepction Phone #: ###-####
BLD13-02007 BLD-Final10/17/201310/18/201310/18/2013 1:46:56 PMPNR
Trae Phone #: ###-####. Needs other trades finals first.
BLD13-00645 BLD-Energy code compliance10/17/201310/18/201310/18/2013 11:05:41 AMAPART
Requesting Air Seal Inspection for the South half of the building and the final framing and shear nailing inspection on interior walls. Phone #: ###-#### >> Inspection requested via web by Greg Baisch. ok to insulate south half og building. Pending electrical and mechanical rough in inspections.
BLD13-02841 BLD-Footing10/17/201310/18/201310/18/2013 9:26:47 AMAPASS
jim Phone #: ###-####
BLD13-02659 BLD-Footing10/17/201310/18/201310/18/2013 9:01:10 AMANH
ed Phone #: ###-####. No one at residence, called ed, left voice mail, no call back. no inspection done at this time.
GCB13-00138 GCB-Footing10/17/201310/18/201310/18/2013 8:42:19 AMANR
Antoine ###-####. no one on site. no plans, property lines not strung, no form boards in place.