ELE15-01348
| Electrical Rough-In | 10/17/2016 | 10/18/2016 | 10/18/2016 12:55:16 PM | P | PASS |
|
|
Northeast corner of Annex building soffit. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson Area noted rough in ok cover
|
ELE16-02989
| Electrical Rough-In | 10/17/2016 | 10/18/2016 | 10/18/2016 11:12:03 AM | A | PASS |
|
|
kitchen and laundry room. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Areas noted rough in ok cover
|
ELE16-03378
| Electrical Rough-In | 10/17/2016 | 10/18/2016 | 10/18/2016 10:21:49 AM | A | PASS |
|
|
We Removed Old Troffer Style Fixtures And Are Upgrading To New LED Fixtures With The Addition Of An Exit Sign And Occupancy Sensors. The Cielning Whips Fixture We Reused Are Existing And Need Ok To Cover Ceiling With New Tile! Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Grid rough in ok cover
|
ELE15-03901
| Conference | 10/17/2016 | 10/18/2016 | 10/18/2016 10:11:10 AM | A | DONE |
|
|
Call Pierce to discuss sealing of 1/2" knockouts in lighting boxes of Clearwater TI. Phone #: ###-#### Inspection requested via web by Rafael Castillo Pierce provided info on a cable connector to close KO in cover. If listed connector they are OK to use.
|
ELE16-02991
| Electrical Rough-In | 10/17/2016 | 10/18/2016 | 10/18/2016 8:59:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M 9th floor nurses station grid rough in ok cover
|