ELE14-00717
| ELE-Aging Inspection | 10/18/2018 | 10/18/2018 | 10/23/2018 12:38:30 PM | | FAIL |
|
|
final inspection needs scheduled by contractor..contact has been made
|
ELE18-03996
| Final | 10/18/2018 | 10/18/2018 | 10/18/2018 3:43:25 PM | P | PASS |
|
|
bldg ON-1...ok to final
|
ELE18-03995
| Final | 10/18/2018 | 10/18/2018 | 10/18/2018 3:42:59 PM | P | PASS |
|
|
bldg ON...ok to final
|
ELE18-03990
| Final | 10/18/2018 | 10/18/2018 | 10/18/2018 3:42:26 PM | P | PASS |
|
|
bldg A...ok to final
|
ELE18-02922
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 3:41:51 PM | P | PASS |
|
|
final for bldg P Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE13-00373
| ELE-Aging Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 2:19:04 PM | | PASS |
|
|
permit expired
|
ELE13-00373
| DOC - Permit Expired | 10/18/2018 | 10/18/2018 | 10/18/2018 2:18:45 PM | P | PASS |
|
|
multiple remodels have been done since permit pulled...remodels have permits by other contractors...expiring permit
|
ELE18-02549
| Final | 10/18/2018 | 10/18/2018 | 10/18/2018 2:10:31 PM | P | PASS |
|
|
Call for access Phone #: ###-#### Inspection requested via web by John VanZandt...ok to final
|
ELE18-02550
| Final | 10/18/2018 | 10/18/2018 | 10/18/2018 2:10:04 PM | P | PASS |
|
|
Call for access Phone #: ###-#### Inspection requested via web by John VanZandt...ok to final
|
ELE18-04006
| Electrical Rough-In | 10/18/2018 | 10/18/2018 | 10/18/2018 1:59:33 PM | P | PASS |
|
|
need cover for walls and ceiling owner should be there Phone #: ###-#### Inspection requested via web by dennis mcneely...ok to cover-new bedroom and bathroom off living rm
|
MIS18-00406
| ELE-Conference | 10/17/2018 | 10/18/2018 | 10/18/2018 1:36:20 PM | A | NH |
|
|
working without permits Phone #: ###-####.. no one home added correction notice for electrical...contractor showed up while in my car...i motioned to him to speak with me while he was at front door and he ignored me and walked inside and closed door...would not answer door after...checked license plate and plate number references company name- AC TO Z...called mech inspector and plumbing inspector and informed them of situation
|
ELE18-03989
| Conference | 10/17/2018 | 10/18/2018 | 10/18/2018 12:13:08 PM | A | PASS |
|
|
Mark Phone #: ###-####...discussed the raising of his riser...going from a 6ft riser to 10ft riser to get clearance over new gazebo...riser replacement only...discussed wire size and am ok with ID PWR reconnecting before inspection if need be
|
ELE18-03990
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 11:18:25 AM | A | CANC |
|
|
final for bldg A Phone #: ###-#### Inspection requested via web by Todd Hall...moved to next day AM
|
ELE18-03985
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 11:07:25 AM | A | PASS |
|
|
Robert Phone #: ###-####...ok to final
|
ELE18-03965
| Rough-In Permanent Service | 10/17/2018 | 10/18/2018 | 10/18/2018 10:48:01 AM | A | PASS |
|
|
Please call first If I cannot answer. The key is under the blue recycle bin in the back of the building. Phone #: ###-#### Inspection requested via web by Eddy Udry.... verify at final labelling outside and inside panel/junction is completely sealed p/s o/h reconnect ok
|
ELE18-03592
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 10:26:09 AM | A | NR |
|
|
Please call our office when on the way so we can let the homeowner aware and call Wayne with any questions at ###-####. Phone #: ###-#### Inspection requested via web by William Salts...rescheduled for next day 10/19/18 for AM
|
ELE18-02295
| Electrical Rough-In | 10/17/2018 | 10/18/2018 | 10/18/2018 10:16:04 AM | A | PASS |
|
|
Partial rough in inspection. Phone #: ###-#### Inspection requested via web by Debby Pierce...GYM west offices walls ok to cover...discussed vestibules of GYM and bonding LV rack
|
ELE18-00849
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 9:44:27 AM | A | PART |
|
|
Please call 30 minutes ahead if possible. Bob is our site contact Phone #: ###-#### Inspection requested via web by Graham Estep.. left to inspect: circuit #8, GFI protection for vending, GFI within 6ft sink upstairs QC rm, convur, work tables fed off poles, misc equipment, panel rm-panels, LV rack bond.. temp occupency given
|
ELE18-02300
| Electrical Rough-In | 10/18/2018 | 10/18/2018 | 10/18/2018 8:40:48 AM | A | PASS |
|
|
Gym walls for cover and roof penetrations Phone #: ###-#### Inspection requested via web by Jason Parke...ok to cover designated areas...discussed 2 vestibules in GYM that need built once sheeted and sheetrock-1 E-light in ea
|
ELE18-03965
| Permanent Service | 10/16/2018 | 10/18/2018 | 10/18/2018 7:42:26 AM | P | CANC |
|
|
please call so i can get you in ###-#### Phone #: ###-#### Inspection requested via web by Eddy Udry...scheduled for AM as well
|