ELE18-03905
| Final | 10/17/2018 | 10/18/2018 | 10/19/2018 4:47:41 AM | P | CANC |
|
|
Robert Phone #: ###-#### Need existing wiring removed proir to final (8-3 stubbed out below wiring )
|
ELE17-03193
| Final | 10/18/2018 | 10/18/2018 | 10/19/2018 4:47:41 AM | P | PASS |
|
|
Backup Generator installed Generac service complete and ready for demonstration of generator function and automatic transfer switching operation Final instalation permit inspection requested. Phone #: ###-#### Inspection requested via web by Carl Pelletier Final ok
|
ELE18-01476
| Final | 10/18/2018 | 10/18/2018 | 10/18/2018 1:09:24 PM | P | PASS |
|
|
Inspection requested via web by Steve McCloy Final ok and card signed
|
ELE18-03944
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 11:36:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Service change final ok
|
ELE18-03841
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 11:21:25 AM | A | CANC |
|
|
No final until finished will re-schedule for next day
|
ELE18-03972
| Permanent Service | 10/17/2018 | 10/18/2018 | 10/18/2018 11:20:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Edwards AFC was sent by text and will be posted for final Fault given is 5,216 L,L,L from IPCO p/s o/h n ok
|
ELE18-02573
| Final | 10/17/2018 | 10/18/2018 | 10/18/2018 9:47:39 AM | A | FAIL |
|
|
Please call if door is locked Thanks. Phone #: ###-#### Inspection requested via web by chris hall 1) Faceplates required in laundry room 2)Fireplace receptacle needs finished 3)AFCI protection required for master bed 4)Service receptacle required for A/C and installed within 25'
|
ELE18-03841
| Electrical Rough-In | 10/17/2018 | 10/18/2018 | 10/18/2018 9:18:26 AM | A | PASS |
|
|
Replace old lighting with new led lighting in fuel canopy. All primary power to remain as is. Phone #: ###-#### Inspection requested via web by Ken Olsen Wrong day Phone #: ###-#### Inspection requested via web by Ken Olsen Verified U/L listing of existing fixtures being retroffited in Deisel canopy fueling area ok
|
ELE18-03841
| Electrical Rough-In | 10/17/2018 | 10/18/2018 | 10/17/2018 9:04:16 AM | A | CANC |
|
|
Replace old lighting with new led lighting in fuel canopy. All primary power to remain as is. Phone #: ###-#### Inspection requested via web by Ken Olsen Wrong day for inspection
|
ELE18-03841
| Final | 10/17/2018 | 10/18/2018 | 10/17/2018 9:03:58 AM | A | CANC |
|
|
Replace old lighting with new led lighting in fuel canopy. All primary power to remain as is. Phone #: ###-#### Inspection requested via web by Ken Olsen Wrong day
|