BLD18-00800
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/19/2018 10:19:49 AM | P | PASS |
|
|
Life safety passed. Station 14 approved the opticon
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00799
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:20:42 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00798
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:20:13 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00797
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:19:52 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00795
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:19:19 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00919
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:18:55 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00920
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:18:31 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00921
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:18:07 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD18-00685
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 2:17:37 PM | P | PASS |
|
|
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.
Phone #: ###-#### Inspection requested via web by KJ Savaria
|
FIR18-00414
| INSP-Final Inspection | 10/16/2018 | 10/18/2018 | 10/18/2018 1:37:50 PM | P | CANC |
|
|
Not ready for final
Jordan Fuger is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00130
| INSP-Final Inspection | 10/16/2018 | 10/18/2018 | 10/18/2018 1:37:22 PM | P | PASS |
|
|
Permit finaled
Jordan Fuger is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00414
| INSP-Sprinkler Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 1:36:27 PM | A | PASS |
|
|
Forward flush test passed, Second floor rough-in passed and piping can be re-covered. Need ball drip piped, need pressure relief vavles piped, need interconnection with the fire alarm system tested, need soffits for the ESFR heads finished installed, need the overhead door stops installed as discussed.
Jordan Fuger is the contact for this rough to cover inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-01332
| FIRE-Conference | 10/18/2018 | 10/18/2018 | 10/18/2018 1:34:14 PM | P | DONE |
|
|
I went over life safety requirements
Steve Phone #: ###-####
|
BLD18-01555
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 10:43:52 AM | A | PASS |
|
|
Life safety passed
after 9am // Jake Erickson Phone #: 208-###-####
|
FIR17-00626
| INSP-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 9:29:07 AM | A | FAIL |
|
|
Need to pretest interconnection with the fire sprinkler devices, one 15cd strobe is mounted too high, another 15cd strobe is overspaced, missing two weather proof back boxes, drawings show networking with the airport fire alarm system but networking has not been set up so there is no off site or on site communiction. No actual testing performed.
Please call to schedule exact time. Phone #: ###-#### Inspection requested via web by Gary Gambino
|
FIR17-00603
| INSP-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 9:26:44 AM | A | FAIL |
|
|
The interconnection with the fire alarm panel has not been pre-tested, the FDC is not in the location shown as approved on the plans, need to perform a forward flush test now since people will be utilizing the new area that the new fire sprinkler system protects.
Todd Ketterling is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00507
| INSP-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 9:24:53 AM | A | PASS |
|
|
Permit finaled
Todd Ketterling is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-04316
| FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 8:15:24 AM | A | PART |
|
|
Life safety complete for the second floor. All emergency lights and exit signs have been repaired. Can't final the permit until the sprinkler permit is complete which is providing sprinkler protection at the ground level, at the stairs.
Phone #: ###-#### Inspection requested via web by Bob Thornton
|