BLD17-03282
| BLD-Framing/Rough-in | 10/18/2018 | 10/18/2018 | 10/18/2018 4:21:44 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Adam Joslin
|
BLD18-01191
| BLD-Framing/Rough-in | 10/18/2018 | 10/18/2018 | 10/18/2018 4:21:33 PM | P | PASS |
|
|
Requesting a framing inspection on the perimeter gym walls. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD16-04498
| BLD-Final | 10/18/2018 | 10/18/2018 | 10/18/2018 2:57:27 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Correction notice posted.
|
BLD16-04498
| BLD-Blower Door Test Results | 10/18/2018 | 10/18/2018 | 10/18/2018 2:33:04 PM | P | DONE |
|
|
5.7ACH @50 pa
|
BLD18-03345
| BLD-Final | 10/11/2018 | 10/18/2018 | 10/18/2018 2:20:27 PM | P | DONE |
|
|
Plans left on site in the meter box Phone #: ###-#### Inspection requested via web by Ashley White
|
BLD18-03345
| DOC - Permit Finaled | 10/18/2018 | 10/18/2018 | 10/18/2018 2:20:20 PM | P | PASS |
|
|
|
BLD18-02992
| BLD-Final | 10/17/2018 | 10/18/2018 | 10/18/2018 2:20:12 PM | P | PASS |
|
|
An Phone #: ###-####. Ok for pem occ.
|
BLD18-02304
| BLD-Framing/Rough-in | 10/18/2018 | 10/18/2018 | 10/18/2018 2:19:54 PM | P | PASS |
|
|
|
BLD16-00818
| BLD-Framing/Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 12:22:55 PM | A | PART |
|
|
Aleksandr Phone #: ###-####. Framing ok. Needs to complete air seal and fireblock above stairs.
|
BLD17-03648
| BLD-Ceiling Grid Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 11:43:42 AM | P | PASS |
|
|
Ceiling grid for soffits in ware house ok.
|
BLD17-04568
| BLD-Framing/Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 11:17:21 AM | A | PART |
|
|
Bob Phone #: ###-####. Interior steel stud framed walls and soffits ok. Engineer of record to review exterior shear wall construction and approve or with modification.
|
BLD17-03648
| BLD-Ceiling Grid Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 11:15:55 AM | A | CANC |
|
|
Jose Phone #: ###-####.
|
ESC18-00716
| Site Final | 10/18/2018 | 10/18/2018 | 10/18/2018 10:26:03 AM | A | DONE |
|
|
|
ESC18-00716
| DOC - Permit Finaled | 10/18/2018 | 10/18/2018 | 10/18/2018 10:25:55 AM | P | PASS |
|
|
|
BLD18-01678
| BLD-Final | 10/17/2018 | 10/18/2018 | 10/18/2018 10:25:20 AM | A | PASS |
|
|
Zack Phone #: ###-####
|
BLD18-01678
| DOC - Permit Finaled | 10/18/2018 | 10/18/2018 | 10/18/2018 10:25:06 AM | P | PASS |
|
|
|
BLD18-03318
| BLD-Conference | 10/17/2018 | 10/18/2018 | 10/18/2018 10:09:50 AM | A | DONE |
|
|
call 30 mins -Adam Phone #: ###-####
|
BLD18-02673
| BLD-Framing/Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 10:02:00 AM | A | PART |
|
|
Adam Phone #: ###-####. Ok to insulate. Need mech. rough in inspection. Complete all fire blocking
|
BLD18-02574
| BLD-Framing/Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 9:11:16 AM | A | PART |
|
|
Mike,
Give me a call when you are your way. Thanks. Todd Phone #: ###-#### Inspection requested via web by Todd Kurns. Neds to remove screws from top track to grid. Needs electrical rough in inspection.
|
BLD18-03796
| BLD-Foundation | 10/17/2018 | 10/18/2018 | 10/18/2018 8:45:55 AM | A | PART |
|
|
PRESTON Phone #: ###-####
|
BLD18-02304
| BLD-Other | 10/17/2018 | 10/18/2018 | 10/18/2018 8:04:11 AM | A | CANC |
|
|
roof inspection // Jason Phone #: ###-####. Moved to pm per contracotr.
|