Inspections for the day of: Thursday, October 18, 2018.
Number of inspections: 35
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01125 Site Final10/3/201810/18/201810/22/2018 12:02:25 PMANR
Will keep open until project across street is complete and landscaped. Then the DI bag may be pulled. Perimeter of yard has been hydroseeded.
ESC18-00465 General Inspection10/18/201810/18/201810/19/2018 2:39:21 PMPPASS
No construction activity. Site stabilized. Backyard pool complete, permit finaled.
ESC18-00620 Site Final10/18/201810/18/201810/19/2018 2:37:29 PMPPASS
HOme complete. Yard landscaped and stabilized. No BMPs or loose material left on site. ESC permit conditions satisfied.
ESC17-01473 General Inspection10/18/201810/18/201810/19/2018 1:18:27 PM CANC
rescheduled
ESC18-01033 Site Preparation10/18/201810/18/201810/19/2018 12:14:30 PMPPASS
Justin 208.830.0687

Reviewed ESC plan with project manager-RP. Old fire station to be replaced with new station. BMPs include fugtive dust control during demolition, inlet protection on storm drain @ sycamore and State Street and preserving existing stabilized site access and perimeter curbing.

Approved for construction
ESC17-01354 Site Final10/18/201810/18/201810/18/2018 3:58:20 PMPPASS
HOme complete, landscaped, & occupied. No temporary BMPs left around site, site is clean. ESC permit finaled.
ESC18-00977 General Inspection10/18/201810/18/201810/18/2018 3:50:44 PMPPART
WIP non apartment complex renovation. No trackout from site. No earthwork occuring next to Loggers Creek, creekside vegetation has been preserved.

Correction request to provide trash containment or trash cans for workers and materials on the creek side of building.
ESC18-00312 General Inspection10/18/201810/18/201810/18/2018 3:36:12 PMPPASS
WIP on frame. Permit posted in window. Backyard adjacent to waterway has preserved vegeation buffer and sediment control wattle installed. No trackout.

Follow up scheduled to make sure pile of wood is hauled away in timely matter. No corrections at this time.
ESC18-00035 Site Final10/18/201810/18/201810/18/2018 3:14:11 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC18-00124 Site Final10/18/201810/18/201810/18/2018 3:13:49 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC18-00126 Site Final10/18/201810/18/201810/18/2018 3:13:31 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC18-00127 Site Final10/18/201810/18/201810/18/2018 3:13:17 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC18-00036 Site Final10/18/201810/18/201810/18/2018 3:12:56 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC18-00035 Site Preparation10/18/201810/18/201810/18/2018 3:12:37 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC18-00010 Site Final10/18/201810/18/201810/18/2018 3:11:50 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01721 Site Final10/18/201810/18/201810/18/2018 3:11:16 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01722 Site Final10/18/201810/18/201810/18/2018 3:11:03 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01716 Site Final10/18/201810/18/201810/18/2018 3:10:35 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01435 Site Final10/18/201810/18/201810/18/2018 3:10:03 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01647 Site Final10/18/201810/18/201810/18/2018 3:09:44 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01435 Site Final10/18/201810/18/201810/18/2018 3:09:10 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01646 Site Final10/18/201810/18/201810/18/2018 3:08:21 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01436 Site Final10/18/201810/18/201810/18/2018 3:07:56 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01599 Site Final10/18/201810/18/201810/18/2018 3:07:21 PMPPASS
Townhome complete. Temp. BMP removal and final stabilization with construction of remaining units covered by ESC16-01561 main site permit
ESC17-01261 Aging Inspection10/18/201810/18/201810/18/2018 2:59:26 PM PASS
Townhome complete, landscaping installed. DI bag in storm drain in front of home has been removed.
ESC17-01261 DOC - Permit Finaled10/18/201810/18/201810/18/2018 2:59:15 PMPPASS
ESC17-01295 Aging Inspection10/18/201810/18/201810/18/2018 2:59:01 PM PASS
Townhome complete, landscaping installed. DI bag in storm drain in front of home has been removed.
ESC17-01295 DOC - Permit Finaled10/18/201810/18/201810/18/2018 2:58:09 PMPPASS
ESC17-01362 BMP Violation10/18/201810/18/201810/18/2018 2:55:23 PMPPART
Trash and materials contained within site. Ecopan washouts provided. No discharges around perimeter. Some minor trackout is still occuring. RP to sweep each day, site should be paved early November.

Correction request to continue monitoring trackout and install inlet protection on first storm drain to the east of the entrance.
ESC17-01480 Aging Inspection10/18/201810/18/201810/18/2018 12:29:58 PM CANC
ESC17-01387 General Inspection10/18/201810/18/201810/18/2018 12:29:40 PM CANC
ESC17-01336 Aging Inspection10/18/201810/18/201810/18/2018 12:16:25 PM CANC
rescheduled for site final
ESC18-01082 Site Preparation10/17/201810/18/201810/18/2018 11:24:44 AMAPASS
Ed Johnston Phone #: ###-####

Site walk through with GC Ed and landscape architect/plan designer Terry King.

Will preserve existing asphalt from Idaho to the work area behind building. Asphalt in work area will be stripped, creating a below grade area that should be self contained.

Will provide green ESC permit.

Reviewed requirements for washout containment, dust control and being sure and to prevent dirty runoff to permeable pavers in alley.
Approved
ESC04-00880 DOC - Permit Finaled10/18/201810/18/201810/18/2018 9:05:18 AMPPASS
ESC03-01241 DOC - Permit Finaled10/18/201810/18/201810/18/2018 9:05:12 AMPPASS