BLD19-03184
| BLD-Energy code compliance | 10/18/2019 | 10/18/2019 | 10/18/2019 4:49:08 PM | P | PART |
|
|
Steven Phone #: ###-#### air seal ok
|
BLD18-01135
| BLD-Aging Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 4:48:01 PM | | PASS |
|
|
Expires: 12/03/19
|
BLD18-02015
| BLD-Aging Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 4:44:19 PM | | PASS |
|
|
Expires: 12/03/19
|
BLD19-04076
| BLD-Conference | 10/18/2019 | 10/18/2019 | 10/18/2019 4:19:11 PM | P | PASS |
|
|
Building a concrete surround. Checking in before I pour concrete. Phone #: ###-#### Inspection requested via web by Thomas Dubert ok to call for final upon mech. completion.
|
BLD19-02318
| BLD-Foundation | 10/18/2019 | 10/18/2019 | 10/18/2019 4:03:36 PM | P | PASS |
|
|
mike Phone #: ###-####
|
BLD19-01828
| BLD-Foundation | 10/17/2019 | 10/18/2019 | 10/18/2019 4:03:36 PM | A | DONE |
|
|
Trash enclosure stem walls. Pour is scheduled for 11am. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD19-01112
| BLD-Final | 10/18/2019 | 10/18/2019 | 10/18/2019 4:03:35 PM | P | PASS |
|
|
Larren Phone #: ###-####
|
BLD19-02122
| BLD-Footing | 10/17/2019 | 10/18/2019 | 10/18/2019 2:20:25 PM | P | PASS |
|
|
GL-A spread footings. Please see on site superintendent to confirm. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD18-02797
| BLD-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 12:35:13 PM | A | PASS |
|
|
Mike Phone #: ###-####
|
BLD18-03245
| BLD-Wall cover | 10/17/2019 | 10/18/2019 | 10/18/2019 12:12:29 PM | A | PART |
|
|
Robbie Phone #: ###-#### ok to insulate exterior and coridors// remove ceilling at elavator and lundry shaft/ plm void ceilling drain line/ check for collor spacing/ remove ceilling at water closet east cordor closet.
|
BLD19-00317
| BLD-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 11:41:08 AM | P | CANC |
|
|
Fire life and safety will be out in the am. So will planning and zoning, and public works Phone #: ###-#### >> Inspection requested via web by chad stradley Inspection cancelled from web by: chad stradley
|
BLD19-00929
| BLD-Energy code compliance | 10/17/2019 | 10/18/2019 | 10/18/2019 11:20:24 AM | A | PASS |
|
|
Chris Phone #: ###-####
|
BLD19-01628
| BLD-Framing/Rough-in | 10/17/2019 | 10/18/2019 | 10/18/2019 10:53:16 AM | A | FAIL |
|
|
Inspection requested via web by Rob Ashworth soffits covered w/o insp. 1/2 inch ply// missing floor truss hanger nailling at mlb stairs/ b-vent void combustable foam.
|
BLD19-01629
| BLD-Framing/Rough-in | 10/17/2019 | 10/18/2019 | 10/18/2019 10:49:57 AM | A | FAIL |
|
|
Inspection requested via web by Rob Ashworth front sopffits porch and garage covered w/o fire treated ply// no listing for hardboard sidding to be non combustable.
|
BLD19-03314
| BLD-Conference | 10/17/2019 | 10/18/2019 | 10/18/2019 12:00:00 AM | P | CANC |
|
|
CANCEL BY DUSTY -Dusty Phone #: ###-####
|