PLM95-01372
| INSP - Sewer line | 10/18/1995 | 10/19/1995 | 10/19/1995 12:00:00 AM | A | PART |
|
|
10/18/95 323 - partial sewer ok
|
PLM95-01385
| INSP - Plumbing Rough-in | 10/19/1995 | 10/19/1995 | 10/19/1995 12:00:00 AM | P | PASS |
|
|
9 FIXTURES IN ALL
|
PLM95-01386
| INSP - Ground work | 10/19/1995 | 10/19/1995 | 10/19/1995 12:00:00 AM | P | PASS |
|
|
5 FT OF OUTSIDE BUILDING. TRENCHING AND BACKFILLING SEWER MOP SINK WATER HEATER, FLOOR DRAIN TWO CLEAN OUTS AND ONE DOUBLE CHECK $4,495.00 READY AT 4:00 TODAY
|