BLD00-00286
| BLD-Concrete | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | A | PART |
|
|
###-#### grade beam placed w/special insp. pending report. 10/19/2000 10:36:50 AM
|
BLD98-02194
| BLD-Framing/Rough-in | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | A | PASS |
|
|
steve ###-#### reinspection
|
BLD00-00662
| BLD-Foundation | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | A | PASS |
|
|
FOUND WALL STEVE ###-####
|
BLD00-01726
| BLD-Concrete | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 07:37:37. Contact: ###-####. pending report. 10/19/2000 5:05:48 PM
|
BLD00-02038
| BLD-Final | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | FAIL |
|
|
Chris ###-#### need ele final insp./ must cover or remove papper exposed on insulation. 10/19/2000 2:21:39 PM
|
BLD00-02518
| BLD-Framing/Rough-in | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | FAIL |
|
|
shear wall travis ###-#### missing hold down./holes in pannel. 10/20/2000 10:52:10 AM
|
BLD00-01030
| BLD-Framing/Rough-in | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | FAIL |
|
|
###-#### shear nailing nail blk. 10/20/2000 10:52:24 AM
|
BLD00-01563
| BLD-Concrete | 10/16/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 15:18:42. Contact: ###-####. pending report. 10/19/2000 5:05:24 PM
|
BLD00-01261
| BLD-Foundation | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | PART |
|
|
stem wall Rich ###-#### east half of bldg. ok for steim wall. 10/19/2000 2:35:42 PM
|