ELE00-03964
| Final | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 16:22:10. Contact: ###-####. a/cl compressor units, (2ea.) 10/19/2000 12:29:38 PM
|
ELE00-03777
| Electrical Rough-In | 10/18/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 16:56:06. Contact: ###-####. northend-half; walls ele r/i. 10/19/2000 12:29:01 PM
|
ELE00-04047
| Electrical Rough-In | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | PART |
|
|
late pm\\###-#### Mike. conference, temporary & main service panel code requirements. 10/19/2000 8:54:24 PM
|
ELE00-03457
| Final | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 08:26:37. Contact: ###-####. nec: 370-20: boxes shall be flush with combustible material. 10/19/2000 8:55:52 PM
|
ELE00-03670
| Final | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | PASS |
|
|
###-#### daryl. completed. 10/19/2000 8:53:20 PM
|
ELE00-03624
| Final | 10/19/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | PASS |
|
|
fn insp darrell ###-####. completed. 10/19/2000 9:02:11 PM
|
ELE00-02998
| Final | 10/17/2000 | 10/19/2000 | 10/19/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 07:52:22. Contact: ###-####. nec: 200-10(b). terminals of devices shall be wired correctly. 10/19/2000 9:00:47 PM
|