Inspections for the day of: Thursday, October 19, 2000.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01182 BLD-Framing/Rough-in10/18/200010/19/200010/19/2000 12:00:00 AMAFAIL
DWAYNE ###-####- CALL 1ST BEFORE INSP FR c/n posted 10/19/2000 12:42:09 PM prior c/n not complete. 10/19/2000 12:42:23 PM
BLD00-02622 BLD-Framing/Rough-in10/18/200010/19/200010/19/2000 12:00:00 AMAPASS
###-####ok subject to ele insp. 10/19/2000 10:31:32 AM
BLD00-02179 BLD-Framing/Rough-in10/18/200010/19/200010/19/2000 12:00:00 AMAFAIL
Jon ###-####c/n posted . 10/19/2000 12:41:54 PM
BLD00-01943 BLD-Final10/18/200010/19/200010/19/2000 12:00:00 AMAFAIL
FN JOHN ###-#### -KEY ABOVE FRONT DOOR FOR ACCESSc/n posted. 10/19/2000 12:41:27 PM
BLD00-01735 BLD-Final10/18/200010/19/200010/19/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/18/2000 at 17:47:53. Contact: ###-####.
BLD00-00199 BLD-Final10/19/200010/19/200010/19/2000 12:00:00 AMAPASS
Made ok. CofC #19221 issued
MEC00-03527 Rough-in10/17/200010/19/200010/19/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/17/2000 at 16:10:19. Contact: ###-####.ok but not yet framed in. 10/19/2000 1:44:04 PM
MEC00-03380 Final10/19/200010/19/200010/19/2000 12:00:00 AMPPASS
garage door is unlock Kevin ###-#### furnace gas test a/c
BLD99-03319 BLD-Final10/19/200010/19/200010/19/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/19/2000 at 09:15:21. Contact: .c/n posted. 10/19/2000 2:54:52 PM
MEC00-02923 Final10/19/200010/19/200010/19/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/19/2000 at 09:17:15. Contact: ###-####.
BLD00-02443 BLD-Framing/Rough-in10/19/200010/19/200010/19/2000 12:00:00 AMPPASS
###-####
BLD00-02508 BLD-Framing/Rough-in10/19/200010/19/200010/19/2000 12:00:00 AMPPASS
###-####ok corrections complete . 10/19/2000 3:46:55 PM 10/19/2000 3:47:18 PM
MEC00-03569 Final10/19/200010/19/200010/19/2000 12:00:00 AMPPASS
for f/p- western heating ###-#### fn
MEC00-03279 Rough-in10/19/200010/19/200010/19/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/19/2000 at 11:15:46. Contact: ###-####.