Inspections for the day of: Thursday, October 19, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01670 BLD-Final10/18/200010/19/200010/19/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/18/2000 at 15:44:31. Contact: ###-####.
signed occ. card 10/19/2000 11:22:09 AM
BLD00-00670 BLD-Framing/Rough-in10/18/200010/19/200010/19/2000 12:00:00 AMAPART
shear Miki ###-####
exterior nailing ok, verify retrofit hold downs 10/19/2000 9:26:38 AM
BLD00-01524 BLD-Framing/Rough-in10/18/200010/19/200010/19/2000 12:00:00 AMACANC
CALL 1ST BEFORE INSP SHEILA-- ###-#### FR
MEC00-02172 Final10/19/200010/19/200010/19/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 10/19/2000 at 07:19:11. Contact: ###-####.
BLD99-02585 BLD-Final10/18/200010/19/200010/19/2000 12:00:00 AMAFAIL
###-####
c/n posted, see owner 10/19/2000 10:32:01 AM
BLD00-02727 BLD-Wall cover10/18/200010/19/200010/19/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/18/2000 at 14:00:29. Contact: ###-####.
exterior shear ok 10/19/2000 3:49:32 PM
BLD00-03003 BLD-Final10/19/200010/19/200010/19/2000 12:00:00 AMPNR
sign\\1###-####
BLD00-02628 BLD-Footing10/19/200010/19/200010/19/2000 12:00:00 AMPPART
Tim ###-####
BLD00-02457 BLD-Framing/Rough-in10/19/200010/19/200010/19/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/19/2000 at 10:56:03. Contact: ###-####.
ok to insulate 10/19/2000 3:24:51 PM
BLD00-01824 BLD-Framing/Rough-in10/19/200010/19/200010/19/2000 12:00:00 AMPPART
masonary wall insp curtis ###-####
pending report from special 10/19/2000 4:41:42 PM