BLD01-01733
| BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | A | PART |
|
|
###-#### ANDY..ok to roof, obtain elec r/i, n/r 10/19/2001 10:30:59 AM
|
BLD01-01643
| BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | A | NR |
|
|
###-####...east stair "enclosure" ok to cover. 10/19/2001 11:27:06 AM
|
BLD01-00106
| BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 13:30:48. Contact: ###-####. ok to install lid at 1st fl of add'n, exc at restrooms 10/19/2001 11:44:15 AM
|
BLD01-02431
| BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/19/2001 9:08:54 AM w/bldr...keep c/n
|
BLD01-000-1
| BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/19/2001 10:42:08 AM w/ bldr re handrails/guards/stairs.
|
BLD01-02102
| BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 10/19/2001 11:30:16 AM w/ supt re adjacent elev const & tenant remodel; ok to install elev walls now, complete t/i later.
|
BLD01-02267
| BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/19/2001 2:00:33 PM w/ Larry Hanson...has spec insp reports for fireproofing & welds
|
BLD99-03148
| BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/19/2001 2:25:57 PM keep c/n...need make corrections to exit doors at bar. t/o ok for 2nd fl only
|
BLD00-02175
| BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/19/2001 2:27:01 PM w GS...need make corrections at exit door asap
|
BLD01-01854
| BLD-Framing/Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/19/2001 4:52:38 PM ceiling ok
|
BLD01-02267
| BLD-Framing/Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 08:53:38. Contact: ###-####...awaiting spec insp reports from Strata 10/19/2001 2:21:23 PM
|
BLD00-03538
| BLD-Concrete | 10/17/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PART |
|
|
mike-- ###-#### concrete ; 10/19/2001 4:40:40 PM
|
BLD01-00265
| FIRE-Final Inspection | 10/18/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | CANC |
|
|
###-#### frank 10-19-01 FRANK CALLED IN TO CANCEL THIS INSPECTION..
|
BLD01-00265
| BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | CANC |
|
|
###-#### frank FRANK CALLED IN TO CANCEL INSPECTION AND RSET FOR MONDAY 10-19-01 ///DLD
|
BLD01-00186
| BLD-Framing/Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | FAIL |
|
|
###-#### dave..add'l c/n...clarify "occ. separations", dampers, eng's geo-tech & flood cert to be submitted. ok to begin cover, except at hvac areas. 10/19/2001 5:08:08 PM
|
BLD01-01854
| BLD-Final | 10/19/2001 | 10/19/2001 | 10/19/2001 12:00:00 AM | P | PASS |
|
|
Don, ###-#### card at site 10/19/2001 4:52:55 PM
|