BLD04-00592
| FIRE-Final Inspection | 10/15/2004 | 10/19/2004 | 10/19/2004 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 10/19/2004 12:50:00 PM
|
FIR04-00545
| INSP-Final Inspection | 10/18/2004 | 10/19/2004 | 10/19/2004 12:00:00 AM | A | FAIL |
|
|
Sprinkler piping is ok to cover but can't give final until ceiling tile has been installed 10/19/2004 12:50:58 PM
|
FIR04-00496
| INSP-Sprinkler Rough-in | 10/18/2004 | 10/19/2004 | 10/19/2004 12:00:00 AM | A | PASS |
|
|
This work was not inspected since contractor did not call for inspection of the temporary work. However permanent work was inspected at completion of project. 10/19/2004 12:58:04 PM
|
FIR04-00469
| INSP-Conference | 10/19/2004 | 10/19/2004 | 10/19/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with dave millers permission until the fire sprinkler permit is finaled. Per the signed notice they will have the work completed by January 15, 2005 10/19/2004 4:12:18 PM
|
BLD04-00138
| BLD-Conference | 10/19/2004 | 10/19/2004 | 10/19/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with dave millers permission until the fire sprinkler permit is finaled. Per the signed notice they will have the work completed by January 15, 2005. 10/19/2004 4:12:59 PM
|
BLD04-02226
| FIRE-Final Inspection | 10/19/2004 | 10/19/2004 | 10/19/2004 12:00:00 AM | P | FAIL |
|
|
Provide required flu spaces between racking as noted on review comments while maintaining isle widths 10/19/2004 3:22:06 PM
|