PLM07-02716
| Plumbing Rough-in | 10/19/2007 | 10/19/2007 | 10/19/2007 4:22:06 PM | P | PASS |
|
|
holly Phone #: ###-####
|
PLM07-02716
| DOC - Permit Finaled | 10/19/2007 | 10/19/2007 | 10/19/2007 4:21:54 PM | P | PASS |
|
|
holly Phone #: ###-####
|
PLM07-01619
| PLM-Aging Inspection | 10/19/2007 | 10/19/2007 | 10/19/2007 3:24:51 PM | | PASS |
|
|
|
PLM07-03503
| Plumbing Rough-in | 10/18/2007 | 10/19/2007 | 10/19/2007 2:35:27 PM | P | FAIL |
|
|
UNIT "C" Phone #: ###-#### Internet Inspection Request from: Penny Smith need to raise two inch vent behind master bath tub to 6 inches above flood level rim of water closet as per upc 905.3 2003
|
PLM07-03499
| Plumbing Rough-in | 10/18/2007 | 10/19/2007 | 10/19/2007 2:33:41 PM | P | FAIL |
|
|
UNIT "D" Phone #: ###-#### Internet Inspection Request from: Penny Smith need to raise two inch vent behind master bath tub to 6 inches above flood level rim water closet as per upc 905.3 2003
|
PLM07-03527
| Roof Drains | 10/18/2007 | 10/19/2007 | 10/19/2007 11:42:30 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 10/18/2007 at 2:43:16 PM. Contact: ###-####. need to finish piping drains to pit and test contractor to recall when ready
|
PLM07-01778
| PLM-Aging Inspection | 10/19/2007 | 10/19/2007 | 10/19/2007 10:07:39 AM | | PASS |
|
|
|
PLM07-01778
| DOC - Permit Finaled | 10/19/2007 | 10/19/2007 | 10/19/2007 10:07:27 AM | P | PASS |
|
|
finaled under permit plm07-00058
|
PLM07-03517
| Sprinkler (Final) | 10/18/2007 | 10/19/2007 | 10/19/2007 10:02:34 AM | A | PASS |
|
|
John; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
PLM07-03499
| Plumbing Rough-in | 10/18/2007 | 10/19/2007 | 10/18/2007 3:52:04 PM | P | CANC |
|
|
UNIT "C" Phone #: ###-#### Internet Inspection Request from: Penny Smith Inspection cancelled from web by: Penny Smith
|