FIR09-00441
| FIR-Aging Inspection | 10/19/2009 | 10/19/2009 | 10/20/2009 4:29:33 PM | | PEND |
|
|
Pending site inspection request.
|
FIR09-00413
| INSP-Sprinkler Rough-in | 10/19/2009 | 10/19/2009 | 10/19/2009 3:58:34 PM | P | PART |
|
|
Final pending ceiling tile, escutcheons, hydrostatic test, C/N items.
|
FIR09-00523
| INSP-Final Inspection | 10/19/2009 | 10/19/2009 | 10/19/2009 3:56:53 PM | P | NR |
|
|
Rick- call 30 mins prior to going Phone #: ###-####
|
FIR09-00384
| INSP-Sprinkler Rough-in/Hydro | 10/19/2009 | 10/19/2009 | 10/19/2009 3:56:31 PM | P | PART |
|
|
See annotations on plan set marked with today's date for inspection notes including two blocked upright heads by adjacent truss web members, insulation at the deck needs lifted away from deflectors at two heads, install baffle or relocate two heads which exceed min. spacing. Discussed seismic bracing and coverage at the front entry vestibule. Noted correction items from the previous inspection are finished.
|
FIR09-00561
| INSP-Sprinkler Rough-in/Hydro | 10/19/2009 | 10/19/2009 | 10/19/2009 3:51:38 PM | A | PART |
|
|
Work in progress
|
FIR09-00476
| INSP-Sprinkler Rough-in/Hydro | 10/19/2009 | 10/19/2009 | 10/19/2009 3:50:40 PM | A | PART |
|
|
Okay to cover 1st floor as noted on stamped plan set.
|